Peter Wright Pfau
Architect · Pfau Long Architecture · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-21794First issued Sep 18, 1990, expires Feb 28, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 39 permits since 2004, 39 in the last 5 years. Latest filed Nov 2, 2026.
- What kind of projects?
- Commercial or tenant improvement 17 · New building 5 · Other 5
- How long do their permits take?
- Commercial or tenant improvement: 4 months. City typical for the same review: 3 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 17 permits in San Francisco
Time to get a permit
Median from filing to permit, from 15 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 11,334 permits.
Where
- Mission7
- South of Market4
- Mission Bay2
- Bayview Hunters Point1
Most recent
- 3153 17th StAlteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the twoDec 26, 2025Issued
- 3175 17th StChange of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings.Dec 9, 2025Issued
- 1060 Key AvInterior demo work per ab-017May 29, 2025Issued
- 899 Howard StCp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs.Feb 9, 2022Issued
- 885 Folsom StInterior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . .............................................................Nov 19, 2020Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 2, 2026 | 3175 17th St Proposed compaction grouting ot densify potentially liquifiable soils and reduce earthquake induced settlement and related loss of foundation support. ref#: 202511179769. Filed | Seismic retrofit or foundationType unconfirmed | Filed | — | |
| Dec 26, 2025 | 3153 17th St Alteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the two Issued | Commercial or tenant improvement | Issued | 7 months | |
| Dec 9, 2025 | 3175 17th St Change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings. Issued | Commercial or tenant improvement | Issued | 7 months | |
| May 29, 2025 | 1060 Key Av Interior demo work per ab-017 Issued | Commercial or tenant improvementType unconfirmed | Issued | Within 1 month | |
| Jan 21, 2025 | 1060 Key Av Voluntary seismic upgrade at hope and peace buildings and patch/repair of affected areas. it will also provide accessibility improvements at the main entrance of the hope building. Issued | Seismic retrofit or foundation | Issued | 5 months | |
| Oct 18, 2024 | 200 Rhode Island St Revision to bpa# 201910023333: to designate 12,333 gsf of office and 3035 gsf retail on first floor; designate 21,317 gsf to pdr on second floor. Complete | Revision or supplement | Complete | Within 1 month | |
| May 3, 2023 | 680 Indiana St For leasing office provide 3/4" conduit w/ 3x #10 wire for mini slip unit. provide disconnect & whip fro condenser, (1) 2 20 amp circuit breaker in (e) panel. condenser unit to be mounted on exterior. indoor slit unit to be mounted inside leasing office Cancelled | Other | Cancelled | — | |
| Dec 2, 2022 | 490 Brannan St Demolition and complete removal of existing billboard structure. billboard number referenced are 2509,541387 and 1546,541389. Filed | OtherType unconfirmed | Filed | — | |
| Dec 1, 2022 | 200 Rhode Island St Revision to bpa#201910023333 fabricate a transom window to match adjacent, transom windows. steel tube crossmember to match the roll up door. new manual rolup door 11' x 14'-7" to match (e) frames @ other bays Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 22, 2022 | 490 Brannan St Demolish a 1 story retail-bank bldg type 3-b. Filed | Other | Filed | — | |
| Jun 17, 2022 | 200 Rhode Island St New roof top patio built on top of the (e) 5-story bldg portion of the site. roof deck consist of pedestal pavers and planters with seating area. ref 201910023333 for c + s approvals and roof deck entitlements as a deffered submittal. Issued | Revision or supplementType unconfirmed | Issued | 7 months | |
| Feb 9, 2022 | 899 Howard St Cp-zoc case no 2015009140fa: convert 2nd & 3rd fl of the (e)bldg from retail to office use,to create a ground fl office lobby in total 46,388 sf of retail space will be converted to office with two new elevators service. the office levles above(n) restroom on the 2nd & 3rd flrs. Issued | Commercial or tenant improvement | Issued | 5 months | |
| Feb 9, 2022 | 899 Howard St Addition of a 4,415 sf indoor office amnity space & additional unclosed rooftop amenity space approved per planning commission motion #2015-0091 to establish 70,881 sf of additional office use at 875-899 howard Issued | Addition | Issued | 6 months | |
| Feb 9, 2022 | 899 Howard St Exterior renovation of an (e) 3-story structure known as 899 howard demolition of (e) cement plaster cladding, glass block & concrete infill panels. installation of a new aluminum & glass curtain wall system with integrated metal cladding sunscrees & canopies per planning dept case no 2015-009141ofa Issued | Other | Issued | 3 months | |
| Nov 15, 2021 | 899 Howard St All floors: ab-017 demo interior partitions, demolish all mep equipment back to trunklines or mpoe, patch and repair rated conditions as necessary, remove selected vertical circulation and retain all interior rated conditions, and comply with pid complaint # 2021182084. Issued | Legalize or fix a violation | Issued | 19 months | |
| Mar 9, 2021 | 3250 18th St Place 3 relocatable classroom buildings in the school yard of existing school and connect to existing utilities. Complete | New buildingType unconfirmed | Complete | 6 months | |
| Nov 19, 2020 | 885 Folsom St Interior partition to renovate (e) office spaces & restrooms. addition of kitchenette, ramps & entry doors. installation of salvaged skylights in (e) openings. m.e.p. & structural under separate . ............................................................. Issued | Commercial or tenant improvement | Issued | 2 months | |
| Sep 17, 2020 | 1 De Haro St Revision to pa# 201710121125 s3. revision is limited to include access hatch added to top of elevator shaft. added to provide access to a smoke detector mounted in the elevator shaft. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 4, 2020 | 2800 03rd St To erect a 6 stories, type 1b, factory and low-hazard storage bldg.**comply w/ maher ord# 155-13, route to dph** Filed | New building | Filed | — | |
| Oct 2, 2019 | 200 Rhode Island St Priority project: core & shell alteration & integration of (3) structures (on same lot) ada upgrades, preservation of 5-story building & removal of non-historic features. (n) entry lobby on rhode island street @ old loading dock. other facade abd rooftop changes compatible with historic character. Complete | Commercial or tenant improvement | Complete | 27 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Peter Wright Pfau? Request a correction.