Renato M Jose
Architect · Renato Jose I Architect · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-28111First issued Apr 20, 2000, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 16 permits since 2010, 16 in the last 5 years. Latest filed Aug 13, 2026.
- What kind of projects?
- Home remodel 8 · Addition 4 · ADU 1
- How long do their permits take?
- Home remodel: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 8 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 8,628 permits.
Where
- Hayes Valley2
- West of Twin Peaks1
- Noe Valley1
- Mission1
Most recent
- 604 Oak St #0Project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights.Jul 27, 2026Issued
- 25 Forest Side AvRear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacementFeb 20, 2026Issued
- 212 Valley St #0Alterations to e condo unit in a 2 unit residential building. the work consists of plan layout adjustments for an open living/dining/kitchen and adjusted bedroom wing, replace exterior windows in kind,addition of 2 n skylights, new plumbing/elec fixturesJan 27, 2026Issued
- 3566 19th St3/f: a primary bathroom and bath #2 renovation. no structural work.Mar 21, 2024Complete
- 825 Rolph StAdd sink and hallway access to an (e)toilet room for a full powder -add a master bath + w.i.c. for master suite -convert (e)linen closet to a w/d closet -add a (n)skylight over the (e)stairs and modify closet in br 01 to accommodate skylight.May 20, 2020Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 13, 2026 | 25 Chattanooga St Conversion of an (e) basement storage & crawlspace into an attached adu.the adu project generally consists of a (n) open living/dining/kitchen,(n) bedroom,(n) office, (n) bath. ground floor rear addition w/deck above. Filed | ADU | Filed | — | |
| Jul 27, 2026 | 604 Oak St #0 Project generally consists of a kitchen and bath remodel of a condo flat. switch kitchen and dining room locations, relocate bath location, reconfig closet and bedrm walls at bedrm 1, new appliances, lighting, plumbing fixtures, 2 new skylights. Issued | Home remodel | Issued | Within 1 month | |
| Feb 20, 2026 | 25 Forest Side Av Rear 3rd story attic conversion for primary suite.living,dining,kitchen layout at the 2/f.alteration of the (e) stair to a code-compliant stair at all levels.removal of pre-existing illegal kitchen at the lower level family room.kitchen area to be replaced with a wet bar.deck guardrail replacement Issued | Home remodel | Issued | 4 months | |
| Jan 27, 2026 | 212 Valley St #0 Alterations to e condo unit in a 2 unit residential building. the work consists of plan layout adjustments for an open living/dining/kitchen and adjusted bedroom wing, replace exterior windows in kind,addition of 2 n skylights, new plumbing/elec fixtures Issued | Home remodel | Issued | 3 months | |
| Mar 21, 2024 | 3566 19th St 3/f: a primary bathroom and bath #2 renovation. no structural work. Complete | Home remodel | Complete | Within 1 month | |
| Oct 27, 2023 | 144 25th Av To comply with boa's decision no. 23-030. revision to original pa 202302021229. reconfigure rear deck and stairs. provide structural details for 10' fence. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 22, 2023 | 1413 Noe St To comply with nov 202309726. provide an access stair from basement level to rear yard + crawlspace. replace rotting floor beam and posts below rear bay (laundry + study) at the basement. new metal rail guardrail (rear) at kitchen slider door. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Feb 2, 2023 | 144 25th Av The project generally consists of replacement of the (e) first floor deck and expanding the deck to the rear - yard setback line; addition of a roof deck above the second br office floor, accessed via 4 new door from the third fl. office Complete | Deck, stairs or patio cover | Complete | 4 months | |
| Apr 15, 2022 | 1274 Sanchez St Interior alteration of the basement and first floor. partial horizontal addition at the north side yard. vertical addition of a (n) second floor above the (e) first floor. exterior facade alterations. (n) roof deck Complete | Addition | Complete | 14 months | |
| Mar 16, 2022 | 56 Clipper St Revision to permit 201909232354: adding wet bar to an existing bookshelf space in the (e) living room. Complete | Revision or supplement | Complete | 1 month | |
| Aug 25, 2021 | 722 48th Av Additions to an (e) 3-story residence consists of: horizontal extension towards the side property lines at the rear of the (e) first story pop-out. partial infill of the basement below the first story for an additional bedroom suite. 123.1 sq ft deck area extension. provide nfpa 13d on basement only Issued | Addition | Issued | 17 months | |
| Dec 14, 2020 | 825 Rolph St Revision to pa# 202005207639. no work will be done on 2nd floor. administrative permit for reduced scope of work only. Complete | Revision or supplement | Complete | 7 months | |
| May 20, 2020 | 825 Rolph St Add sink and hallway access to an (e)toilet room for a full powder -add a master bath + w.i.c. for master suite -convert (e)linen closet to a w/d closet -add a (n)skylight over the (e)stairs and modify closet in br 01 to accommodate skylight. Complete | Home remodel | Complete | 3 months | |
| Sep 23, 2019 | 56 Clipper St Horizontal addition at the main flr front yard. partial interior alteration of the mail flr. a 3rd story (2nd flr) vertical addition for a master suite. exterior facade alterations at the front elevation including (n) windows & siding. (n) roofdeck. Complete | Addition | Complete | 16 months | |
| Jun 21, 2019 | 3212 Broderick St The project generally consistes of the alteration of the 3rd floor to alter an extg bathroom and add one new bathroom. no exterior work to be done. all work is contained within the extg bldg envelope. n/a for maher. Complete | Home remodel | Complete | Within 1 month | |
| Oct 2, 2018 | 3212 Broderick St Remodel, alterations and addition to an (e) 3-story, single family residence: hoizontal 3rd story addition at an (e) 3rd story deck. rear horizontal 1st story addition. first & third story interior remodel. Cancelled | Addition | Cancelled | — | |
| Jan 4, 2018 | 313 Castro St Add 1 bedroom & 1 office on 3rd fl. revision to expired bpa# 201708225549 (vertical addition on the 3rd fl roof deck) Issued | Revision or supplement | Issued | 40 months | |
| Oct 10, 2017 | 602 Oak St #0 Dry rot in framing was discovered around the garage door during stucco replacement work (#201708306405). project scope is voluntary strengthening upgrade at the garage opening, consisting of (n) foundation and moment frame at the rear Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Jul 16, 2010 | 602 Oak St Replace t-111 siding at rear of house (3 sides) w/no horzontal t&g siding, painted. replace dryrot studs as req'd. replace dryrot wood plank fence memebers in kind. re-flash and water proof 4 windows at the rear deck. Complete | Other | Complete | Within 1 month | |
| Jul 9, 2010 | 3580 Jackson St Kitchen, playroom, study, bath remodel. replacement of e roof with standing seam copper. level of part of basement with new foundation wall & slab work. plumbing/elec work in remodel areas. change material at exterior deck,change windows @ rear of playroom level. new exterior fireplace @ top deck Complete | Home remodelType unconfirmed | Complete | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Renato M Jose? Request a correction.