Ryan Bogart
Engineer · Zfa Structural Engineers · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-6104First issued Jun 24, 2014, expires Dec 31, 2026.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 33 permits since 2020, 33 in the last 5 years. Latest filed Apr 17, 2026.
- What kind of projects?
- Commercial or tenant improvement 10 · Seismic retrofit or foundation 6 · Home remodel 4
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 10 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 14,601 permits.
Where
- Financial District/South Beach4
- South of Market3
- Mission2
- Western Addition1
Most recent
- 201 03rd St2nd & 3rd - installing phone booths. phone booths will be anchored to the existing slab with post installed anchorsFeb 20, 2026Complete
- 835 Turk StAb-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm.Apr 30, 2025Issued
- 350 Brannan St2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompassesMay 7, 2024Complete
- 350 Brannan StDecommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code.Dec 13, 2023Issued
- 550 03rd StReplace (e) tiered platform, (4) new interior walkable skylight at (e) 2nd fl (interior work only)Jun 14, 2023Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Apr 17, 2026 | 3235 16th St #0 Repair of (e) stairs and landings. new guardrail on the roof. voluntary seismic strengthening of pantry. Filed | Deck, stairs or patio cover | Filed | — | |
| Feb 20, 2026 | 201 03rd St 2nd & 3rd - installing phone booths. phone booths will be anchored to the existing slab with post installed anchors Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jan 29, 2026 | 320 14th St Legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1). Issued | ADUType unconfirmed | Issued | 5 months | |
| Oct 3, 2025 | 1607 Howard St Revision to 202405162245. revised foundations to span to avoid sewer. modify slope of flatwork to provide drainage away from foundation. clarify maximum riser at east stair. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 5, 2025 | 629 Post St Ed 13-01:bsmt,1/f upgrades to offices/common area;elevator to bsmt.alt (e) entrances for ada; voluntary seismic upgrades, soft story retro.alt 1/f residences:20 of 63 units upgrade w/ (n) cooking area. limited ceiling r/r in-kind for floor ties passthrough for seismic upgrade. Issued | Seismic retrofit or foundation | Issued | 7 months | |
| Jun 2, 2025 | 400 Howard St 4th flr - permit revision to 202504023527 - deconfiguration of non-structural demising partitions, light fixtures of ceiling assembly, millwork, plumbing, power outlets and finishes and structural Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 30, 2025 | 835 Turk St Ab-004:renovate 114 sro units,1 mgr 1 br with units reduced to 108 (including #101 prev converted to common space) to provide req mobility units & trash rooms.bsmnt: structural brace frames,rev egress stair & exit door at elm st; remove clay tile walls at bsmt,g/f.mep scope at boiler rm. Issued | Commercial or tenant improvementType unconfirmed | Issued | 5 months | |
| Aug 16, 2024 | 3055 16th St Revision to pa# 2022-1107-6021 100% affordable housing additional structural support required at the storefront. revised storefront, repair & finishes to match existing. Complete | Revision or supplement | Complete | Within 1 month | |
| May 7, 2024 | 350 Brannan St 2/f -demolition existing ceiling height partition, construction of new full height partitions, doors, millwork and finishes. associated power/lighting distribution, associated mechanical system distribution, associated life safety system changes and plumbing. structural scope of work encompasses Complete | Commercial or tenant improvement | Complete | 23 months | |
| Mar 20, 2024 | 121 07th St Revision to pa 202312041851 - minor project structural modifications to new guest rooms; floors 2-4 to lobby and to public restrooms; Expired | Revision or supplement | Expired | Within 1 month | |
| Dec 13, 2023 | 350 Brannan St Decommission and demolition of (e) freight elevator. infill pit with new grade floor slab. establish and document wholesale sales use on the ground floor pursuant to the sf planning code. Issued | Commercial or tenant improvement | Issued | 5 months | |
| Dec 1, 2023 | 440 Davis Ct Replacement of existing guardrail with a new 8'-0" tall security fence and gate at the east and west ends of the plaza level. existing light poles to be retained. Filed | Deck, stairs or patio cover | Filed | — | |
| Jun 14, 2023 | 550 03rd St Replace (e) tiered platform, (4) new interior walkable skylight at (e) 2nd fl (interior work only) Complete | Commercial or tenant improvement | Complete | 1 month | |
| May 25, 2023 | 350 Brannan St Establish office use per 2021-011143zad zoning administrator determination letter. renovate ground and 2nd floors. no work on 3rd floor. demolition of existing ceiling height partitions, new full height non bearing partition walls, cold form steel infill and glass guardrail attachments, mep deferred Withdrawn | Commercial or tenant improvementType unconfirmed | Withdrawn | — | |
| May 24, 2023 | 741 South Van Ness Av Accessibility upgrades to an existing non-sprinklered unconditioned 2-story & mezzanine wood frame assembly building. accessibility changes at entry & platform lift and bathroom. Complete | Commercial or tenant improvement | Complete | 1 month | |
| May 5, 2023 | 741 South Van Ness Av Voluntary seismic upgrade to an existing non-sprinklered 2 story plus mezzanine wood frame assembly building. Complete | Seismic retrofit or foundation | Complete | 5 months | |
| Mar 24, 2023 | 550 03rd St Replace (e) stair at lobby, new interior partitions & new floor infill @ 2nd fl, at (e) double height spaces Complete | Commercial or tenant improvement | Complete | 2 months | |
| Mar 24, 2023 | 1027 Bosworth St Voluntary strengthening 1st fl of existing 2 story wood framed, single family residence. new mat slab to support a car lift. Complete | Home remodel | Complete | 3 months | |
| Feb 17, 2023 | 430 Lake St #0 Rev to pa# 2022-0929-3433 to include (3) additional footing replacement; original permit was a voluntary soft story seismic strengthening Issued | Revision or supplement | Issued | Within 1 month | |
| Feb 9, 2023 | 260 Townsend St Gr/f:removal of existing 3-story tall glass atrium exterior enclosure & installation on new metal panel & glass entry portal & canopy. Cancelled | Other | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Ryan Bogart? Request a correction.