Shawn M Anderson
Architect · Msa Architecture+Design · Pacifica
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-31273First issued Aug 22, 2007, expires Jun 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 86 permits since 2001, 86 in the last 5 years. Latest filed Apr 23, 2026.
- What kind of projects?
- Commercial or tenant improvement 76 · Other 6 · Home remodel 2
- How long do their permits take?
- Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 76 permits in San Francisco
Time to get a permit
Median from filing to permit, from 63 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 24,353 permits.
Where
- Financial District/South Beach53
- Chinatown6
- Pacific Heights5
- Lakeshore2
Most recent
- 201 Spear St13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strappingApr 23, 2026Complete
- 44 Montgomery St2nd, 3rd, 4th, 17th, 21st & 22nd floor - interior ti relocate (e) pre-frabricated nstall ismic trapping. all booths less than 48" apart shall have sprinklers . re-install pre-fabricated phone boothsOct 7, 2025Complete
- 201 Spear StT.i of (e) space. relocate (e) pre-fabricated phone booths. install strapping. all booth less than 48" apart shall have sprinklers, re-install pre-fabricate phone booth for floor 4,5,6,13 only.Sep 10, 2025Complete
- 415 Mission St36/fl:tenant improvement of (e) space.no exterior work conference room , new storefront and dodor. no change of use. executive office new door/hardware demo of millwork and shelving interior finished. install millwork with acess door,signage around (e) electrical panel. install hinged acoustic andAug 18, 2025Filed
- 600 California St2/f & 3/f: relocate (e) pre-fabricated telephone booths. install seismic strapping.Oct 16, 2024Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Apr 23, 2026 | 201 Spear St 13th fl - ti of (e) space - relocate (e) pre-fabricated phone booths and install seismic strapping Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 10, 2025 | 201 Spear St Revision to pa # 202509104944: to eliminate scope of work on 13th fl. addition of the 3 phone booth on the 5th fl. provide seismic strapping. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 5, 2025 | 6100 Geary Bl Voluntary seismic upgrade of (e) retail banking space,requiring full removal & reconstruction of (e) ti conditions, including mep, (e) tenant to remain, no change in use, no change in building area. Filed | Seismic retrofit or foundation | Filed | — | |
| Oct 7, 2025 | 44 Montgomery St 2nd, 3rd, 4th, 17th, 21st & 22nd floor - interior ti relocate (e) pre-frabricated nstall ismic trapping. all booths less than 48" apart shall have sprinklers . re-install pre-fabricated phone booths Complete | Commercial or tenant improvement | Complete | 1 month | |
| Sep 10, 2025 | 201 Spear St T.i of (e) space. relocate (e) pre-fabricated phone booths. install strapping. all booth less than 48" apart shall have sprinklers, re-install pre-fabricate phone booth for floor 4,5,6,13 only. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Aug 18, 2025 | 415 Mission St 36/fl:tenant improvement of (e) space.no exterior work conference room , new storefront and dodor. no change of use. executive office new door/hardware demo of millwork and shelving interior finished. install millwork with acess door,signage around (e) electrical panel. install hinged acoustic and Filed | Commercial or tenant improvement | Filed | — | |
| Jul 16, 2025 | 500 Treat Av Tenant improvement of an existing space. work to include to replace roof top hvac. all exterior work only. Issued | Other | Issued | Within 1 month | |
| May 28, 2025 | 1 California St Deferred submittal for permit 2024-0611-4142. revision to approved permit 2025-0206-9815 to show head detail changes and curb shown around the building. Complete | Revision or supplement | Complete | 2 months | |
| Apr 4, 2025 | 1 California St Revision to pa 2024-0611-4142 added scope to include repair of damaged existing shaftwall per inspector comments Filed | Revision or supplement | Filed | — | |
| Feb 27, 2025 | 1 California St Deferred submittal of permit # 202406114142: replacement of the exterior curtainwall system. Issued | Revision or supplementType unconfirmed | Issued | 2 months | |
| Dec 6, 2024 | 1 California St Revision to permit 202406114142 revised restroom layout on ground and second floors. additional floor cores for low voltage stub-ups Complete | Revision or supplement | Complete | Within 1 month | |
| Oct 16, 2024 | 600 California St 2/f & 3/f: relocate (e) pre-fabricated telephone booths. install seismic strapping. Issued | Commercial or tenant improvementType unconfirmed | Issued | 5 months | |
| Oct 9, 2024 | 2025 Van Ness Av Structural revision to 202311130657: revision to architectural equipment, lighting, revising demo work. revision to structural framing of roof unit, show new stepped concrete, remove detail where new footing on north wall (new footing is built under wall). revise shoring post due to damaged sill pl Complete | Revision or supplement | Complete | 4 months | |
| Aug 7, 2024 | 150 Stockton St #0 2/f: ti for (e) retail space, scope of work includes millwork, light mechanical work, ceiling lighting is (e) to remain. fitting rooms and cash wrap are (e) to remain. light partition (demo) work. no change in use, occupancy, or zoning. (905 sf total) Reinstated | Commercial or tenant improvement | Reinstated | 2 months | |
| Apr 9, 2024 | 150 Stockton St #0 Interior tenant improvement of existing retail space for new vendor, work to include built in millwork, lighting and electrical. no change in use, occupancy, egress or zoning. no exterior work and no sf addition. Issued | Commercial or tenant improvement | Issued | 3 months | |
| Nov 30, 2023 | 2025 Van Ness Av Demo of (e) ti, including interior non bearing partitions, suspended ceilings, mep fixtures, wall finishes. no exterior work. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Nov 13, 2023 | 2025 Van Ness Av Tenant improvement of an existing commerical retail space, including: 1. exterior storefront and finishes 2. structural framing/bracing 3. interior non-bearing partitions 4. millwork and interior finishes 5. mep 6. civil - ada path of travel and parking compliance Complete | Commercial or tenant improvement | Complete | 6 months | |
| Oct 3, 2023 | 2025 Van Ness Av Demo of (e) partitions and millwork in (e) building. no bearing wall to be removed or structural components to be modified. Withdrawn | Commercial or tenant improvement | Withdrawn | — | |
| Sep 28, 2023 | 49 Stevenson St Abate planning code violation# 2023-001179: to accurately document square footage & location of publicly accessible 2,660 sq ft open space (arcade) per motion #10162. provide seating w/in arcade, affix signage per section 138. restaurant encroach no more than 25% (up to 665 s.f.) in arcade. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Sep 26, 2023 | 425 Market St 14/f: demolition of interior non-load bearing partitions, ceiling, lighting, millwork, plumbing fixtures and flooring. construction of new non-load bearing partitions, restroom upgrades of fixtures, eqmt and interior finishes. new lighting and limited electrical. limited mechanical and Complete | Commercial or tenant improvement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Shawn M Anderson? Request a correction.