Stephen G Verner
Architect · Verner Architects
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-34368First issued Aug 19, 2013, expires Nov 30, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 26 permits since 2015, 26 in the last 5 years. Latest filed Oct 23, 2026.
- What kind of projects?
- Addition 8 · Home remodel 7 · Other 4
- How long do their permits take?
- Addition: 11 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 8 permits in San Francisco
Time to get a permit
Median from filing to permit, from 6 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 8,805 permits.
Where
- Marina2
- Inner Richmond1
- Castro/Upper Market1
- Seacliff1
Most recent
- 1139 Lake St #0Lightwell infill w/ four story elevator to improve building accessibility. no increase to bldg height. new common stair & vestibule serving all 3 dwelling units. new stair (interior) at upper most unit.Mar 17, 2026Issued
- 209 Henry StInterior remodel w/2 story rear horizontal addition exempt from 311 pursuant to sec.311.b.3. convert 1183sf of (e) garage space to conditioned living +1 garage car. (n)skylights. windows at rear and side. (n) radiant heating,water heater,electrical. excavate 20", 2new baths@1st flNov 19, 2024Issued
- 1767 Green St2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yardAug 6, 2024Complete
- 1767 Green St2-story infill at open lightwell along west property line. 1-story infill under (e) 2nd fl at rear. partial renovation 1st fl unit, add 1 full bath. deck at 2nd fl with egress stair.Jan 23, 2023Withdrawn
- 127 26th AvHorizontal expansion >10' at rear, ar ground, 1st, + 2nd floors. vertical expansion >7' at rear, to create partial 3rd floor + roof deck w/ height variance for max 33" abv height envelope. renovate (e) 1st + 2nd floors, adding (1) full bath. (n) rearyard deck + stair. excavation at ground flrAug 4, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Nov 2, 2026 | 119 16th Av Rev 202211166671:1 bath removed from 1/f. rear ext @ g/f reduced to 12'5". excavate portion of l/l for increased clg ht @1/f living spaces, +/-22" at br1+p br 1". mass at 4/f addtn reducted. frnt setback maintained, pulled in 10' @rear. Filed | Revision or supplement | Filed | — | |
| Oct 23, 2026 | 1896 Pacific Av #1 Unit 1p- replace existing door with new window. utilize existing opening. remove existing exterior stair. replace existing window unit. Filed | Other | Filed | — | |
| Jul 8, 2026 | 1896 Pacific Av #1 Repair (e) solarium overhead glass. retain (e) roof & solarium structure. repair (e) exterior door ar rec. room. remove (e) tile and topping slab at terrace, retain (e) structural slab.install (n) insulation. waterproofing, drainage & pavers ib pedestal system, tie to drainage system. Issued | Other | Issued | Within 1 month | |
| Mar 17, 2026 | 1139 Lake St #0 Lightwell infill w/ four story elevator to improve building accessibility. no increase to bldg height. new common stair & vestibule serving all 3 dwelling units. new stair (interior) at upper most unit. Issued | AdditionType unconfirmed | Issued | Within 1 month | |
| May 15, 2025 | 1767 Green St Revision to pa #2024-0806-7997 (n) unconditioned storage at (n) crawl space. (n) retaining wall in rear yard. relocate (n) water heaters and heat pumps within crawl space. Complete | Revision or supplement | Complete | 2 months | |
| Nov 19, 2024 | 209 Henry St Interior remodel w/2 story rear horizontal addition exempt from 311 pursuant to sec.311.b.3. convert 1183sf of (e) garage space to conditioned living +1 garage car. (n)skylights. windows at rear and side. (n) radiant heating,water heater,electrical. excavate 20", 2new baths@1st fl Issued | Addition | Issued | 5 months | |
| Aug 6, 2024 | 1767 Green St 2 story addition and infill at open light well w/2 story addition at rear. infill under (e) 2nd fl. add one full bath at 1st fl. unit (n) deck at 2nd fl. w/ egress stair. renovate 2nd fl. unit (n) site and retaining walls at rear yard Complete | Addition | Complete | 2 months | |
| Jun 10, 2024 | 1326 Guerrero St Rev 202304216181- reduction of structural opening at rear elevation, addition of shotcrete @lightwells. legalize (e) front roof deck over garage, replace (e) railings with code complaint railings Complete | Legalize or fix a violationType unconfirmed | Complete | 4 months | |
| May 31, 2024 | 3662 Clay St Revision 202402065307: revision to interior stair framing & n) skylight, demo e) winddow at stair wall & add additional windows. new additional 9 sf at breakfast nook Expired | Revision or supplement | Expired | Within 1 month | |
| Feb 6, 2024 | 3662 Clay St Garage - replace (e) garage door in-kind. basement - demo & replace bay windows in kind; (n) hvac; demo sleect finishes & millwork; 1st fl - demo & replace bay windows in kind; remodel kitchen & diningrm; 20 sf infill/addition @ kitchen; (n) windows@ main stair; 2nd fl - remodel @ primary suite, Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Nov 16, 2023 | 1326 Guerrero St Exterior work only - facade restoration. (e) windows to remain. Complete | Other | Complete | Within 1 month | |
| Sep 20, 2023 | 127 26th Av Moving rear yard retaining wall to full width of bldg. for additional mech'l equipment. rev to addendum. add new 36" handrail, new hot tub install on grade below deck. Complete | Revision or supplementType unconfirmed | Complete | 29 months | |
| Apr 21, 2023 | 1326 Guerrero St Replace(e)brick foundation w/(n) concrete. garage+roof structural upgrade, level house@ rear. full crawlspace digout for(1)additional parking space, install interior stair from garage to main house. n basement w/ n bedroom suite. reno to kitchen & primary suite 2nd flr bath, replace 1 full. shoring. Complete | Seismic retrofit or foundationType unconfirmed | Complete | 6 months | |
| Mar 16, 2023 | 1124 Moraga St Interior remodel w/ minor 136sf infill addition at 1/f, exempt from 311 pursuant to zab-014 "fill in". new skylights, new windows at sides and rear, new pl window, pursuant to ab-009. new bath at 2/f, new heat pump conditioning. new solar by owner. (e) hw to remain. Complete | Home remodel | Complete | 2 months | |
| Jan 31, 2023 | 919 Sanchez St Steel trellis over previously permitted at grade deck, ref pa# 202009265055. 60 sqft open trellis 8'-0" ht above grade Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Jan 23, 2023 | 1767 Green St 2-story infill at open lightwell along west property line. 1-story infill under (e) 2nd fl at rear. partial renovation 1st fl unit, add 1 full bath. deck at 2nd fl with egress stair. Withdrawn | Addition | Withdrawn | — | |
| Oct 14, 2022 | 101 Henry Adams St Ste 144: construct new ada bathroom in sf design center riggs showroom Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Jul 28, 2022 | 1157 Post St Tenant improvement. interior scope finiahes, partitions & finisheings only. ada upfrade at 20% of project budget includes bathrooms on main level, signage, drinking fountain. no work done to exterior under this permit. no new work for mep, maintenance only. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Feb 10, 2022 | 3565 Clay St (n) windows at front third floor to match (e) wood, true divided lites. (n) doors at rear. interior remodel, (n) fixtures & finishes with (n) interior partitions at 1st fl. (n) water feature, tub & finishes at rear yard. Issued | Home remodel | Issued | Within 1 month | |
| Jan 4, 2022 | 1326 Guerrero St Replace(e)brick foundation w/(n) concrete. elective garage+roof structural upgrade, level house@ rear. partial crawlspace digout(approx 43 cu yds)for(1)additional parking space(total2)install interior stair from garage to main house. renovations to kitchen+primary suit, replace(1)half bath @ 1st fl. Withdrawn | Seismic retrofit or foundation | Withdrawn | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Stephen G Verner? Request a correction.