Steven Perry
Architect · Perry Architectus, Inc. · San Rafael
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-26289First issued Mar 13, 1996, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 17 permits since 2012, 17 in the last 5 years. Latest filed Oct 22, 2024.
- What kind of projects?
- Commercial or tenant improvement 9 · New building 4 · Other 2
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 9,405 permits.
Where
- Financial District/South Beach5
- South of Market2
- Potrero Hill1
- Mission1
Most recent
- 790 Pennsylvania AvAddition and relocation of lighting and ventilation as required for new partition wall. all mep, fire alarm and sprinkler under a separate permit. work not visible from streetOct 22, 2024Complete
- 921 Howard StBuild out all gender restroom 143 & 144 for retail spaces including plumbing fixtures, lighting & restroom accessories(ref#201912230270s)Jul 7, 2023Complete
- 1 Bush St #014th fl restroom remodel. remodel all finishes except floors and install new finishes, plumbing fixtures and partitions.Jun 17, 2021Complete
- 160 Folsom StG/f: interior building out 3 retail spaces. accessible entries, restroom, power outlets, mep deffered. maher n/a.Sep 21, 2020Complete
- 160 Spear StTi work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferredMay 16, 2018Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 22, 2024 | 790 Pennsylvania Av Addition and relocation of lighting and ventilation as required for new partition wall. all mep, fire alarm and sprinkler under a separate permit. work not visible from street Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Oct 6, 2023 | 2750 19th St Add freight loading/service vehicle use in the pdr interior space with new curb-cut along bryant street. no change to the building as-built. ref 201712156655 s. Complete | Revision or supplement | Complete | 2 months | |
| Aug 24, 2023 | 2750 19th St Revision to pa# 201712156665-s. provide wheelchair lift as allowed per cbc 11b-410 to provide accessible route to mezzannie. provide new 2nd stari per 1006.2-1 & small metal deck / infill @ (e) opening @ mezzanine deck. Withdrawn | Revision or supplement | Withdrawn | — | |
| Jul 7, 2023 | 921 Howard St Build out all gender restroom 143 & 144 for retail spaces including plumbing fixtures, lighting & restroom accessories(ref#201912230270s) Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| May 26, 2023 | 2750 19th St Revision to issued permit 201712156665-s2 (arch/mep). provide new stair and small area of mezzanine deck infill, required for 2nd accessible egress due to travel distance being over 100 feet per cbc table 1006.2.1. stairways considered accessible means of egress/ 1009.3 exception 1. Withdrawn | Revision or supplement | Withdrawn | — | |
| Aug 17, 2021 | 160 Folsom St Revision to pa# 201406259481 modify 6 units to meet cbc ch11b (from 11a to 11b). Complete | Revision or supplement | Complete | 19 months | |
| Jun 17, 2021 | 1 Bush St #0 14th fl restroom remodel. remodel all finishes except floors and install new finishes, plumbing fixtures and partitions. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Jan 8, 2021 | 2750 19th St Demo of(e) wood frame structure with retention of brick facade. reference bpa# 201712156665 for new addition. Complete | Other | Complete | 3 months | |
| Dec 15, 2020 | 160 Folsom St Revision to bpa#202009214618, remove kitchenette in detail a, adjust restroom locations Complete | Revision or supplement | Complete | 3 months | |
| Oct 28, 2020 | 1395 22nd St Revision to pa 201512145054-s3 to document reduction in scope of work under this permit and defer convenience stair for public access in the right of way to seperate as originally documented on page c300. Complete | Revision or supplement | Complete | 9 months | |
| Sep 21, 2020 | 160 Folsom St G/f: interior building out 3 retail spaces. accessible entries, restroom, power outlets, mep deffered. maher n/a. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Jul 15, 2020 | 2750 19th St Change the construction type from iii-a to i-a for the issued pa# 201712156665-s. ** maher: n/a ** Complete | Revision or supplementType unconfirmed | Complete | 18 months | |
| Dec 23, 2019 | 921 Howard St Erect 17-story, type 1, 203 dwelling units, residential/commercial building. new bldg will be on block 3732, lots 004, 099, 100, 145a, & 146. 100% affordable housing development by tenderloin neighborhood development corp(tndc). fee defer till 1st addendum issue. comply maher ord. Complete | New building | Complete | 17 months | |
| Nov 5, 2019 | 221 Main St 1/f: install new pre manufactured ramp along south elevation bldg on level 01/ground level which is exterior. temporary rerouting of extg egress path from extg to public way. maher n/a. Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Oct 7, 2019 | 1011 03rd St To erect a 24 story, type 1a , 283 residential building with common amenities, vacant ground floor retail spaces. Approved | New building | Approved | — | |
| Feb 7, 2019 | 1395 22nd St Revise lobby (120) and cafe (180) layout, and reduce size of leasing office (123). reference pa#201512145054s3 n/a for maher Complete | Revision or supplement | Complete | Within 1 month | |
| May 16, 2018 | 160 Spear St Ti work to add retail sales area for model unit, including model kitchen and bath, add restroom, kitchen not to be plumbed, mep deferred Complete | Commercial or tenant improvement | Complete | 2 months | |
| May 15, 2018 | 501 Brannan St Exterior finish to remain. rainscreen to be applied on top of extg plaster. n/a for maher Complete | Other | Complete | 4 months | |
| Dec 15, 2017 | 2750 19th St Entire removal of (e) wood frame structure with retention of brick facade, 6 story addition including new subterranean parking, new ground floor commercial & 63 new residential units. (r-2,m,a-2,a-3,s-2) ** maher: n/a ** Complete | Commercial or tenant improvementType unconfirmed | Complete | 28 months | |
| Jul 7, 2017 | 800 Presidio Av Revision to addendum 2(s2) of pa #201204168406 issued 1/4/17: install playground in lower yard of non profit owned community center in place of previously approved decomposed granite. project managed by owner under grant from "kaboom", install pre-fab stair (ada compliant). Complete | Revision or supplement | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Steven Perry? Request a correction.