Andrew Johnston Rodgers
Architect · Rodgers Architecture · Corte Madera
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-30697First issued Jun 22, 2006, expires Oct 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 145 permits since 2003, 145 in the last 5 years. Latest filed May 1, 2026.
- What kind of projects?
- Addition 47 · Home remodel 34 · Deck, stairs or patio cover 16
- How long do their permits take?
- Addition: 11 months. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Addition: 47 permits in San Francisco
Time to get a permit
Median from filing to permit, from 39 issued permits filed since 1966; 3 still in review. City is the San Francisco median for the same kind of review, from 1,691 permits.
Where
- Noe Valley12
- Mission4
- Inner Richmond4
- Castro/Upper Market4
Most recent
- 1421 Shrader StVertical addition of 3/f with interior renovations to 1/f & 2/f. 1/f (n) adu at rear and infill at lightwell (not visible from street). electrical & plumbing as required. special use district- family and senior opportunity.May 1, 2026Cancelled
- 4174 26th StScope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck.Apr 28, 2026Issued
- 763 Kansas St3 story horizontal rear addition to n.east and s.east corners of front bldg, incl interior remodel at all floors for (n) media rm & office at 1st fl, (n) kitchen & pwdr rm @ 2nd fl, 2(n) baths, 1(n) bdrm, & (n) lndry rm @ 3rd fl. (n) roof deck at lvl 4. no work at (e) r-3 cottage @ rear of lot.Nov 3, 2023Issued
- 1449 Lake StScope of work include alterations to front, rear and side elevations. interior renovations to 1st and 2nd flr w/ addition of a 3rd flr and roof deck. new electrical and plumbing work as required by the above scope.Apr 18, 2023Filed
- 1212 Union StExpansion of 3rd floor towards the south property line w/ (n) stair to roof. project to include an alteration of the facade @ 3rd level only. new windows, doors, electrical & plumbing work as required for the above scope.May 31, 2022Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 14, 2026 | 171 Pope St Revision 202509034490- (e) conditions require updated foundation replacmeent at soutn and east walls as shown in structural plans Issued | Revision or supplement | Issued | Within 1 month | |
| May 1, 2026 | 1421 Shrader St Vertical addition of 3/f with interior renovations to 1/f & 2/f. 1/f (n) adu at rear and infill at lightwell (not visible from street). electrical & plumbing as required. special use district- family and senior opportunity. Cancelled | AdditionType unconfirmed | Cancelled | — | |
| Apr 28, 2026 | 4174 26th St Scope of work to include adding a new floor to existing single family dwelling to consist of a new primary bedroom, bathroom, closet, and a modest north deck. Issued | Addition | Issued | 4 months | |
| Mar 13, 2026 | 1439 Oak St Alter-site.1st fl:new 1439-b oak st with new laundry & storage. 2nd fl: renovation of (e) 1439-a oak st. renovation fo (e) 1439 oak st into new unit. 3rd fl: renovate (e) 1441 oak st into new 1441-a oak st & new 1441 oak st. 4th fl: all-new structural, mep work as required. ref 2021-002010 variance. Filed | Commercial or tenant improvementType unconfirmed | Filed | — | |
| Feb 20, 2026 | 638 Rhode Island St Revision to bpa#202306139926- scope of work to include installation of (e) elec. matt in floor heating to replace to (e) elec. base board heating units, no increase to wattage Filed | Revision or supplement | Filed | — | |
| Jan 22, 2026 | 638 Rhode Island St Revision to pa 202302031391 scope of work to include installation of (n) electric matt in floor heating to replace (e) electric base board heating units floor heating units at the 3rd fl. no increase in wattage. no work at (e) 1st & 2nd floors, (e) roof, (e) roof, (e) front facade and rear cottage Issued | Revision or supplement | Issued | Within 1 month | |
| Dec 30, 2025 | 467 Filbert St Remodel (e) bathroom, powder room and closets to include (n) primary bathroom. (n) doors, plumbing and electrical work as needed. no structural work Complete | Home remodel | Complete | Within 1 month | |
| Sep 19, 2025 | 638 Rhode Island St New retaining wall to be reflected on west side of exterior stairs at the rear of the property. not to comply with nov #202290972. nov to be addressed under sepeated permit. Complete | Retaining wall or site work | Complete | Within 1 month | |
| Sep 3, 2025 | 171 Pope St Remodel of 1st and 2nd floor to include two (n)bathrooms, one remodeled bathroom, (n)laundry, (n)bedroom and media room. new interior stairs. (n)skylights above 1st floor stair and 2nd floor bathrooms. alteration of front facade windows to 2nd floor only. mep defered. add 408 sq ft conditioned space Issued | Home remodelType unconfirmed | Issued | 5 months | |
| Apr 16, 2025 | 145 Jefferson St #0 Revision to pa# 202504083967, revised ocupancy load calculations. Issued | Revision or supplement | Issued | Within 1 month | |
| Apr 8, 2025 | 145 Jefferson St #0 2nd/f t.i. cosmetic work only. no construction. patch & paint as neccessary. install casework & display case for museum of failures. new bathroom signage & ada compliant soap dispenser to satisfy ada upgrade. e) light, mrch & sprinkler remain as-is. no change in use, no structural, & exterior work Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Apr 3, 2025 | 145 Jefferson St #0 Ti: patch and paint as necessary. installation of slat walls, casework, and display cases for merchandise display. no structural, (e) lighting, mech, and sprinklers to remain as-is. no change of use. new entry doors to satisfy the new ada requirements. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Mar 11, 2025 | 638 Rhode Island St (n) exterior deck, (n) exterior stair to (n) 3rd fl deck, (n) roof deck, (n) spiral stair to (n) roof deck, (n) window and (n) door at 3rd fl. ref pa# 2023-0203-1391 for additional scope of work to 3rd fl. Issued | Revision or supplementType unconfirmed | Issued | 4 months | |
| Oct 28, 2024 | 442 Noe St Remodel project to consist of enclose south lightwell at first floor, remove (e) scullery/pantry and replace with (n) bathroom and skylight. add 30 in parapet at skylight; add (n) bedroom within (e) footprint at 442 noe. remodel kitchen within (e) footprint and replace 1 (e) window and add 1 (n) Issued | Home remodel | Issued | 4 months | |
| Sep 4, 2024 | 2217 Scott St Unit #402 - renovation of existing penthouse study to include: (n) bathroom, (n) exterior windows to north, south, east and west facade, (n) electrical & plumbing work as required. no structural work. not visable from street Issued | Home remodel | Issued | 1 month | |
| May 28, 2024 | 28 Ashbury St #0 Revision to pa #202205275191 reduce scope. remove full bathroom from plan on 2nd fl Complete | Revision or supplement | Complete | Within 1 month | |
| May 1, 2024 | 1042 Filbert St Proposed roof deck & new stairs, penthouse for use by upper level (3rd flr) unit only, minor bathroom alteration within unit. Filed | Deck, stairs or patio cover | Filed | — | |
| Apr 22, 2024 | 638 Rhode Island St Revision to pa#202209162645: (ref nov# 202313020) - to include window opening modifications on 1st and 2nd floor, exterior plywood and siding replacement, rebuild walk where necessary in kind. (n) exterior stair to 2nd floor at rear of property, (n) exterior stair from grade to 1/f, (n) structural.. Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 21, 2024 | 1212 Union St Revision 202011108615 to include interior remodel to unit 1 to include (n) interior wall next to stairs, replacing (4) windows within the same opening. unit 2 remodel to include replacing windows in kind at the rear of property. replace window on thrid floor and infilling (e) window. add (n) office, Complete | Revision or supplementType unconfirmed | Complete | 1 month | |
| Mar 4, 2024 | 2266 Union St To comply with nov 20249406 remove roof leak into storage room water rain leak sheet rock repair insulation as needed. renovation to (e) bathroom, ada improvements such as (n) grabbars, (n) sink, (n) toilet, (n) 1 hr rated wall. Complete | Legalize or fix a violation | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Andrew Johnston Rodgers? Request a correction.