Anne Mary Torney
Architect · Mithun Architects · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-24386First issued Jul 12, 1993, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 50 permits since 2005, 50 in the last 5 years. Latest filed Jul 21, 2026.
- What kind of projects?
- Commercial or tenant improvement 28 · Home remodel 7 · New building 6
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 28 permits in San Francisco
Time to get a permit
Median from filing to permit, from 28 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 24,024 permits.
Where
- Financial District/South Beach20
- Outer Mission4
- Mission2
- Mission Bay1
Most recent
- 345 Spear St #01st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be servicedJul 21, 2026Issued
- 345 Spear St #0Ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit.Jun 2, 2026Issued
- 188 The EmbarcaderoThis set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes.May 14, 2026Complete
- 345 Spear St #04-5/fl- ti includes the installation of (n) comunicationg stairMar 24, 2026Issued
- 345 Spear St #05th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & caseworkDec 11, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 6, 2026 | 345 Spear St 1st floor: revision to pa #202606022357. structural details for the removal of existing brick veneer. Filed | Revision or supplement | Filed | — | |
| Jul 30, 2026 | 345 Spear St #0 5th fl - revision to pa 202512111612 & 202606263991 adjustment to egress stairs 2 & 5. the (e) 36" doors will be upgraded to 48" and the vestibule will be enlarged to accommodate teh wider doors with a 2-hr rated construction assembly electrical revisions included Issued | Revision or supplement | Issued | 1 month | |
| Jul 21, 2026 | 345 Spear St #0 1st floor: this set of documents is for the tenant improvement of a portion of the ground floor to become a bike repair space. no electrical bikes shall be serviced Issued | Commercial or tenant improvement | Issued | 1 month | |
| Jun 26, 2026 | 345 Spear St #0 Revison to bpa# 202512111612 5/f: removal of hardlid ceiling, architectural archways and reconfiguration of lighting. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 2, 2026 | 345 Spear St #0 Ti of a portion of the ground floor: includes the construction of non- bearing partitions, finishes, doors, frames, and hardware. mep under seperate permit. Issued | Commercial or tenant improvement | Issued | 2 months | |
| May 14, 2026 | 188 The Embarcadero This set of docs are for construction of a furniture storage room in the sub-level parking, the scope of work consists of the construction of non bearing partitions, ceilings, door, frames, hardware, and finishes. Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Apr 13, 2026 | 188 The Embarcadero Basement - set of document is for construction of an mep equipement platform avoce the existing parking access ramp Complete | OtherType unconfirmed | Complete | 1 month | |
| Mar 24, 2026 | 345 Spear St #0 4-5/fl- ti includes the installation of (n) comunicationg stair Issued | Commercial or tenant improvement | Issued | 1 month | |
| Dec 11, 2025 | 345 Spear St #0 5th/f: selective demo of finishes, non beariing partitions, ceiling, lights, doors, frames, hardware & casework Issued | Commercial or tenant improvement | Issued | 1 month | |
| Dec 11, 2025 | 345 Spear St #0 5th/f: reconfigure (e) micro-kitchen, selective demo of finishes t.i. construction of non-bearing partitions,lights finishes, doors, frames, casework & hardware. construction of new electrical, lighting, mech plumbing that will tie into e) system Issued | Commercial or tenant improvement | Issued | 3 months | |
| Dec 11, 2025 | 345 Spear St #0 Tenant improvement of first floor fitness space at hills plaza. tenant improvement includes construction of non-bearing partition, finishes, doors, frames, and hardware Issued | Commercial or tenant improvement | Issued | 9 months | |
| Dec 11, 2025 | 345 Spear St #0 1/fl- scope of work tenant improvement including, non bearing partitions, ceilings, lights, doors, frames, hardware and casework and restroom upgrades for new event space. meps deferred. Issued | Commercial or tenant improvement | Issued | 7 months | |
| Dec 11, 2025 | 345 Spear St #0 1/fl- scope of work includes selective demo of finishes, non bearing partition, ceilings, lights, doors, frames, hardware and casework Issued | Commercial or tenant improvement | Issued | 1 month | |
| Dec 11, 2025 | 345 Spear St #0 1/fl- ti of commerical kitchen at kills plaza. work includes construction of non bearing parititons, finishes, doors, frames and hardware Issued | Commercial or tenant improvement | Issued | 9 months | |
| Dec 11, 2025 | 345 Spear St #0 5/fl- ti includes constrution of non bearing partitions finishes door frames and hardware. this also includes the construction of (n) electrical lighting, and mechanical that will tie into the (e) system Issued | Commercial or tenant improvement | Issued | 3 months | |
| Dec 2, 2025 | 188 The Embarcadero 1st, 6th, & basement: alteration of a front of house into a catering nook to include construction of non-bearing partitions, finishes, door, frames and hardware. mep on seperate permit. Complete | Commercial or tenant improvement | Complete | 3 months | |
| Nov 20, 2025 | 188 The Embarcadero 6th flr: this set of documents is for alteration of an (e) conference room to a lounge. the t.i. scope of work includes the construction of non-bearing partitions, finishes, door, frame and hardware, electrical mechanical, and plumbing shall be submitted as separate permits. Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Nov 3, 2025 | 188 The Embarcadero Ground fl: ti for event space. scope consists of selective demolition and construction of finishes, non bearing partitions, lights, doors, frames and hardware. Complete | Commercial or tenant improvement | Complete | 2 months | |
| Oct 9, 2025 | 200 Folsom St Erect non electric sign: "272 folsom" facing street and not in public right of way. Complete | Other | Complete | 9 months | |
| Aug 11, 2025 | 188 The Embarcadero 1st floor: minor alteration of an existing confrence pace to a private fitness area. the scope of work includes selective demolition of finishes, non bearing partitions, lights, doors, frames and hardware. construction of new partitions finishing, doors, frames & hardware & toilet accessories. Complete | Commercial or tenant improvement | Complete | 2 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Anne Mary Torney? Request a correction.