- Licensed?
- License activeArchitect C-28139First issued Apr 28, 2000, expires Dec 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 28 permits since 2005, 28 in the last 5 years. Latest filed Dec 18, 2025.
- What kind of projects?
- Commercial or tenant improvement 9 · Other 8 · Home remodel 4
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 9 permits in San Francisco
Time to get a permit
Median from filing to permit, from 9 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 4,701 permits.
Where
- Financial District/South Beach4
- Tenderloin1
- Lakeshore1
- Potrero Hill1
Most recent
- 476 Eddy StTenant improvement of the ground floor commercial space of the historic yosemite apartmentSep 16, 2024Issued
- 1 Zoo RdBarrier removal: stepped area of primate center will be made accessible by providing a concrete infill ramp & platform along with new guardrails. n/a ordinance #155-13Jan 25, 2016Issued
- 801 Arkansas StThis project consists of ada barrier removal f0r accessibility to a public toilet room at an existing public park facility. n/a maher ordinanceOct 31, 2014Complete
- 95 Justin DrThis project consists of ada barrier removal for accessibility to the path of travel entramces + public toilet rooms of an existing public park facility. n/a maher ordinanceOct 31, 2014Complete
- 543 Howard St4th floor interior office tenant improvment build-out. no structural, new lights, ducting & finishes.Apr 11, 2014Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Dec 18, 2025 | 20 Franklin St Ed13-01 priority: renovation to units of 100% affordable housing: voluntary seismic upgrades, accessibility upgrades, mep upgrades, facade repair, relocation of amenitie4s to g/f from the basement and interior repair. Filed | Home remodelType unconfirmed | Filed | — | |
| Sep 16, 2024 | 476 Eddy St Tenant improvement of the ground floor commercial space of the historic yosemite apartment Issued | Commercial or tenant improvement | Issued | 2 months | |
| May 6, 2024 | 555 07th St Modernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco. Issued | Other | Issued | 21 months | |
| Sep 22, 2023 | 480 Eddy St Revision to permit 201912190012/s1. adding multiple masonry anchors to the (e) parapet masonry, securing the anchors to cold formed steel framing that is connected to the structural building frame. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 30, 2023 | 78 Johnson St Revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft. Complete | Revision or supplement | Complete | 1 month | |
| Aug 17, 2023 | 480 Eddy St Add 1-hour rated walls in attic from the ceiling to under side of roof deck @ locations shown in bpa#201912190012s1 Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Oct 10, 2020 | 55 Mason St Voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well. Complete | Seismic retrofit or foundation | Complete | 11 months | |
| Dec 13, 2019 | 1 Avenue Of The Palms Erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building Complete | New building | Complete | 16 months | |
| Jun 26, 2019 | 1049 Golden Gate Av Common area, 100% affordable housing, priority & parallel processing. new landscaping, accesible pathways & site lighting for common area. Complete | Retaining wall or site work | Complete | 5 months | |
| Jun 3, 2019 | 1049 Golden Gate Av At bldg e, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. Complete | Other | Complete | 6 months | |
| Jun 3, 2019 | 1049 Golden Gate Av At bldg f, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. Complete | Other | Complete | 6 months | |
| Jun 3, 2019 | 1049 Golden Gate Av At bldg b, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. Complete | Other | Complete | 6 months | |
| Jun 3, 2019 | 1049 Golden Gate Av At bldg c, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. Complete | Other | Complete | 6 months | |
| Jun 3, 2019 | 1049 Golden Gate Av At bldg d, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. Complete | Other | Complete | 6 months | |
| Jun 3, 2019 | 1049 Golden Gate Av At bldg a, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes. Complete | Other | Complete | 6 months | |
| Mar 12, 2019 | 951 Eddy St Unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughout Complete | Home remodel | Complete | 3 months | |
| Jul 11, 2018 | 2451 Sacramento St Improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a ** Issued | Other | Issued | 4 months | |
| Mar 15, 2017 | 350 Ellis St #0 Revision to pa #201511182921-s1: replace (5) tub & enclosure w/accessible epoxy shower pan & surround. remove & replace (e) 12" diameter trash chute & partial shaft wall w/new 18" trash chute, sprinklers, phenomatic intake doors & flushing spray heads @ unit #702,901,902,906,& 1301. Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 15, 2016 | 329 Lombard St Rear bldg. new windows, new bedroom, & entry vestibule addition, new roofing, lighting, finishes, landscape. Withdrawn | Addition | Withdrawn | — | |
| Sep 15, 2016 | 325 Lombard St Front bldg. new windows, radiant heat, roofing, lighting, finishe, landscape, interior kitchen, bath & badroom remodel. Withdrawn | Home remodel | Withdrawn | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Eric S Robinson? Request a correction.