The short answer

Licensed?
License activeArchitect C-28139First issued Apr 28, 2000, expires Dec 31, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the California Architects Board enforcement list on Nov 5, 2026.

Worked in San Francisco?
28 permits since 2005, 28 in the last 5 years. Latest filed Dec 18, 2025.
What kind of projects?
Commercial or tenant improvement 9 · Other 8 · Home remodel 4
How long do their permits take?
Commercial or tenant improvement: 2 months. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
33 permits that name Eric S Robinson, newest first, including 5 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Dec 18, 202520 Franklin St

Ed13-01 priority: renovation to units of 100% affordable housing: voluntary seismic upgrades, accessibility upgrades, mep upgrades, facade repair, relocation of amenitie4s to g/f from the basement and interior repair.

Filed
Sep 16, 2024476 Eddy St

Tenant improvement of the ground floor commercial space of the historic yosemite apartment

Issued
May 6, 2024555 07th St

Modernization of a 3-stop single passenger elevator and elevator machine room with added ventilation to the machine room at 555 7th street in san francisco.

Issued
Sep 22, 2023480 Eddy St

Revision to permit 201912190012/s1. adding multiple masonry anchors to the (e) parapet masonry, securing the anchors to cold formed steel framing that is connected to the structural building frame.

Complete
Aug 30, 202378 Johnson St

Revision to pa# 201912139581 s1. plans of the roof penthouse were altered to show location of access hatch & smoke detector cage at the top of elevator shaft.

Complete
Aug 17, 2023480 Eddy St

Add 1-hour rated walls in attic from the ceiling to under side of roof deck @ locations shown in bpa#201912190012s1

Complete
Oct 10, 202055 Mason St

Voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well.

Complete
Dec 13, 20191 Avenue Of The Palms

Erect (n) (138) 100% affordable multifamily dwelling residence & mixed-used building

Complete
Jun 26, 20191049 Golden Gate Av

Common area, 100% affordable housing, priority & parallel processing. new landscaping, accesible pathways & site lighting for common area.

Complete
Jun 3, 20191049 Golden Gate Av

At bldg e, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Complete
Jun 3, 20191049 Golden Gate Av

At bldg f, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Complete
Jun 3, 20191049 Golden Gate Av

At bldg b, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Complete
Jun 3, 20191049 Golden Gate Av

At bldg c, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Complete
Jun 3, 20191049 Golden Gate Av

At bldg d, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Complete
Jun 3, 20191049 Golden Gate Av

At bldg a, 100% affordable housing, priority & parallel processing. this project renovates affordable housing with new roofing, windows, stucco, insulation, interior fixtures & finishes.

Complete
Mar 12, 2019951 Eddy St

Unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughout

Complete
Jul 11, 20182451 Sacramento St

Improvements to (e) emergency generator, replace fuel oil tank. ** maher: n/a **

Issued
Mar 15, 2017350 Ellis St #0

Revision to pa #201511182921-s1: replace (5) tub & enclosure w/accessible epoxy shower pan & surround. remove & replace (e) 12" diameter trash chute & partial shaft wall w/new 18" trash chute, sprinklers, phenomatic intake doors & flushing spray heads @ unit #702,901,902,906,& 1301.

Complete
Sep 15, 2016329 Lombard St

Rear bldg. new windows, new bedroom, & entry vestibule addition, new roofing, lighting, finishes, landscape.

Withdrawn
Sep 15, 2016325 Lombard St

Front bldg. new windows, radiant heat, roofing, lighting, finishe, landscape, interior kitchen, bath & badroom remodel.

Withdrawn

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.