Jay Sherlock
Architect · Studio J. Architecture · Fairfax
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33354First issued Dec 20, 2011, expires Mar 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 53 permits since 2004, 53 in the last 5 years. Latest filed Jan 30, 2026.
- What kind of projects?
- Home remodel 15 · Addition 15 · Commercial or tenant improvement 6
- How long do their permits take?
- Home remodel: 1 month. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 15 permits in San Francisco
Time to get a permit
Median from filing to permit, from 14 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 20,101 permits.
Where
- Bernal Heights2
- West of Twin Peaks2
- Excelsior1
- Mission1
Most recent
- 745 Brazil AvNew applicance, fixture, counter top and kitchen cabinets, in kitchen - all plumbing and gas to remain in the same locations. all work at upper floor only (kitchen and bathroom remodel, replaced in kind. new,fixtures and cabinets in bathroom, replace tub, wainscolting tile. full tile walls shower,Nov 21, 2024Complete
- 331 Gates StRelocate/reconfigure (e) kitchen and bathroon at 2/f. replace/reconfigure rear shed roof to create conforming door height condition.Nov 21, 2024Complete
- 80 Linda StReplace extg dining room window with folding door and glass guardrail. remove partition wall adjacent to fridge. add and provide pantry cab. replace extg primary deck gaurdrail with new glass guardrail. add decorative trellis sunshading.Dec 21, 2022Complete
- 1481 38th AvProvide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler.Jun 16, 2022Complete
- 4732 17th StRenovate (e) unit w/ 2 bedrooms, 1 bath and kitchen. renovate egress hall for (e) unit. renovate (e) primary unit w/ new stairs to garage level, new laundry, new closet, water heater and trash area. 2nd fl remodel kitchen, bathrooms, fireplace and master bed and bath.Mar 24, 2021Withdrawn
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jun 5, 2026 | 500 De Haro St Revision to pa#202601304970, thicken and raise stem on concrete assembly, see 2/s1 & 3/s3 for more information Issued | Revision or supplement | Issued | Within 1 month | |
| Jan 30, 2026 | 500 De Haro St Replace (e) north entry wall/fence and gate; provide (n) court yard garden podium & wall Issued | Retaining wall or site workType unconfirmed | Issued | 2 months | |
| Dec 23, 2025 | 519 Clipper St Widen existing ingrade concrete stairs. remove strap on wall (no longer 2 parts) revision to pa #201902153129 (s1) Issued | Revision or supplement | Issued | Within 1 month | |
| Nov 21, 2024 | 745 Brazil Av New applicance, fixture, counter top and kitchen cabinets, in kitchen - all plumbing and gas to remain in the same locations. all work at upper floor only (kitchen and bathroom remodel, replaced in kind. new,fixtures and cabinets in bathroom, replace tub, wainscolting tile. full tile walls shower, Complete | Home remodel | Complete | Within 1 month | |
| Nov 21, 2024 | 331 Gates St Relocate/reconfigure (e) kitchen and bathroon at 2/f. replace/reconfigure rear shed roof to create conforming door height condition. Complete | Home remodel | Complete | Within 1 month | |
| Sep 20, 2024 | 2120 Jefferson St Enclose (e) covered porch at rear yard.provide (n) laundry/mud room.relocate (e) g/f bathroom w/ shower.add kitchen counter/cabinets & bar sink.new hvac & w/h.relocate (e) elec pnl.relocate (e) r-yard gate.reconfigure (e) 2 car garage.replace (e) garage doors & windows. Complete | Addition | Complete | 4 months | |
| Aug 5, 2024 | 151 Warriors Wy Revision to pa 202311281506 changes include revise interior ceiling height; remove exterior canopy for exterior elevations; change manager desk and pass through window layout; update finishes. no changes to water fixtures Complete | Revision or supplement | Complete | 2 months | |
| Apr 30, 2024 | 538 22nd Av Administrative updates to pa# 2022-0506-3720. we identified oversights on the front elevation, 3rd story sq ft and 3rd floor deck Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 28, 2023 | 151 Warriors Wy Suite 105-106: first time t.i. of existing commercial retail/food shell. install new kitchen & food service equipment, appliances, and other needed elements. new flooring, lighting, elegant finishes. life safety under separate permit Complete | Commercial or tenant improvement | Complete | 6 months | |
| Feb 16, 2023 | 519 Clipper St Revision to pa# 202203220521, new sump pump in maintenance hallway, remove linear drains from scope. sump pump to drain to city sewer. Complete | Revision or supplement | Complete | Within 1 month | |
| Dec 21, 2022 | 80 Linda St Replace extg dining room window with folding door and glass guardrail. remove partition wall adjacent to fridge. add and provide pantry cab. replace extg primary deck gaurdrail with new glass guardrail. add decorative trellis sunshading. Complete | Home remodelType unconfirmed | Complete | 6 months | |
| Sep 30, 2022 | 1481 38th Av Revision to bpa#202206166525, reduction of scope no new stairs to garage, keep (e) stairs to garage & add fire rated door @ top of stairs to main habitable floor, remove wall @ end of kitchen island, provide new beam above Complete | Revision or supplement | Complete | Within 1 month | |
| Sep 29, 2022 | 519 Clipper St Revise pa#202203220521 to include the construction of new concrete steps tot extg patio. Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 16, 2022 | 1481 38th Av Provide (n) primary bathroom, reconfigure bathroom, reconfigure kitchen reconfigure stairs to garage. replace heat pump water heater, replace heat pump & air handler. Complete | Home remodel | Complete | Within 1 month | |
| May 6, 2022 | 538 22nd Av (n) window, (n) addition at 1st fl, (n) laundry, (n) kitchen, remodel (e) bathroom, 3rd fl rear & vertical adition, (n) roof deck, (n) siding. Complete | Addition | Complete | 19 months | |
| Mar 22, 2022 | 519 Clipper St Lower (e) floor in maintenance pass through Complete | OtherType unconfirmed | Complete | 1 month | |
| Jun 14, 2021 | 97 Saturn St New foundation; create (n) habitable space @ lower level crawl space; new stairs to connect 1st floor with lower level; remodel kitchen, 3 new bedrooms, 2 new bathrooms, 1 laundry room Cancelled | AdditionType unconfirmed | Cancelled | — | |
| Mar 24, 2021 | 4732 17th St Renovate (e) unit w/ 2 bedrooms, 1 bath and kitchen. renovate egress hall for (e) unit. renovate (e) primary unit w/ new stairs to garage level, new laundry, new closet, water heater and trash area. 2nd fl remodel kitchen, bathrooms, fireplace and master bed and bath. Withdrawn | Home remodel | Withdrawn | — | |
| Dec 1, 2020 | 2425 Francisco St Ref pa# 202008061206, 201612013903, 201907297219-s1 revise heating system. new heating and cooling system. 1 - new fau (lower & mid fl) 2 - new heat pump systerm (3rd fl only) Complete | Revision or supplement | Complete | 1 month | |
| Oct 5, 2020 | 1548 Leavenworth St Addition to expand (e) 4th fl to facade & rear allowable setback. (n) roof deck/guardrail & stair/elevator penthouse. connect (e) ground fl office/bath to 2nd fl unit. fill in partial north wall light well. reconfigure building & private entry doors & stairs. remodel both units. Cancelled | Addition | Cancelled | — |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Jay Sherlock? Request a correction.