Michael Paul Gemmill
Engineer · Nabih Youssef Associats · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-4703First issued Jan 30, 2004, expires Jun 30, 2028.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 29 permits since 2005, 29 in the last 5 years. Latest filed Jul 15, 2026.
- What kind of projects?
- Commercial or tenant improvement 15 · Other 4 · Home remodel 3
- How long do their permits take?
- Commercial or tenant improvement: 2 months. City typical for the same review: 4 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 15 permits in San Francisco
Time to get a permit
Median from filing to permit, from 15 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 15,261 permits.
Where
- Financial District/South Beach10
- Mission Bay2
- Mission2
- South of Market1
Most recent
- 44 Montgomery St19th fl. suite 1900: suite is currently vacant in shell condition. sow consists of minimal demo of corridor, incl, entry doors to be replaced, suite build out consists of (n) offices, mtg rooms, and break area, incl, non strl partitions, ppower clg, lighting finishes and millwork. any changes to mepJul 15, 2026Issued
- 185 Berry StTi for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicatiMar 11, 2026Issued
- 595 Market St20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferredFeb 26, 2026Complete
- 3153 17th StAlteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the twoDec 26, 2025Issued
- 3175 17th StChange of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings.Dec 9, 2025Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 15, 2026 | 44 Montgomery St 19th fl. suite 1900: suite is currently vacant in shell condition. sow consists of minimal demo of corridor, incl, entry doors to be replaced, suite build out consists of (n) offices, mtg rooms, and break area, incl, non strl partitions, ppower clg, lighting finishes and millwork. any changes to mep Issued | Commercial or tenant improvement | Issued | Within 1 month | |
| Mar 11, 2026 | 185 Berry St Ti for sierra located on levels 1, 5 & 6. selective demo of portion of (e) floor slabs at levels 5 & 6 to create 3 story, interconnected volume intended for "all-hands" assembly gatherings, work also includes construction of stadium-styled seating & associated stairs between level 4, 5 & communicati Issued | Commercial or tenant improvement | Issued | 3 months | |
| Feb 26, 2026 | 595 Market St 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred Complete | Commercial or tenant improvement | Complete | Within 1 month | |
| Dec 26, 2025 | 3153 17th St Alteration and change of use of an (e) 14,320sf. building with an 5,684sf addition for dance studios and support spaces. new 3rd lv performance space and 1,508sf rooftop terrace (590sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between the two Issued | Commercial or tenant improvement | Issued | 7 months | |
| Dec 9, 2025 | 3175 17th St Change of use of an existing 14,320 sf, builing with an 5,684 sf addition of dance studios and support spaces. a new 3rd level performance space and a 1,508 sf rooftop terrace (590 sf occupiable). scope includes limited improvements at 3153 17th st as well as interconnections between 2 buildings. Issued | Commercial or tenant improvement | Issued | 7 months | |
| Nov 6, 2025 | 185 Berry St Revision to pa 202503263103 additition of a restaurant bar with associated revisions to the food service layout, equipment, & mep systems. exterior work has been modified to replace fixed steel trellises with retractable awnings. does not encroach public right of way. Issued | Revision or supplement | Issued | 4 months | |
| Sep 17, 2025 | 44 Montgomery St 12/f suite 1250: revision to 202505086056 to add 2 phone booths including sprinkler, life/safety and structural anchoring. minor revision only. all other areas within previously approved design are to remain unchanged. Complete | Revision or supplement | Complete | Within 1 month | |
| Jul 15, 2025 | 560 Mission St Revision to permit 202501027602. completed structural details for stone veneer attachment at ground floor level. Issued | Revision or supplement | Issued | 3 months | |
| Apr 15, 2025 | 185 Berry St Converting existing ground level office space into office amenity spaces and a public cafe. exterior work proposes new storefront entries, operable glazed doors, a cantilevered balcony improvements to existing wharf and associated seismic upgrades. Issued | Commercial or tenant improvement | Issued | 4 months | |
| Jan 17, 2025 | 560 Mission St Basement parking garage includes new finishes and lighting at elevator lobby and entry area.g/f: new cafe area, new seating areas throughout, new restrooms and phone rooms, new entry doors and new finishes throughout. 2/f: new seating areas, new training room, new gym area with lockers and showers Issued | Commercial or tenant improvement | Issued | 4 months | |
| Jan 9, 2025 | 225 Bush St Installation of 16 phone booth total: 15th floor 9 phone booths, 16th floor 7 phone booths Complete | Commercial or tenant improvement | Complete | 1 month | |
| Nov 25, 2024 | 415 Mission St Deferred structural permit for application 202404220495 Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Oct 23, 2023 | 185 Berry St Revision to pa# 202206075745. structural portion to change infill details on the roof. added gfrp to add additional structural support. Complete | Revision or supplement | Complete | 7 months | |
| Jun 7, 2023 | 655 Montgomery St Installation of new building maintainence unit at e rooftop including new platform for unit with strengthening of (e) building structure Complete | OtherType unconfirmed | Complete | 1 month | |
| Dec 30, 2022 | 595 Market St 10th fl: installation of life safety and seismic requirements for 2 new phone booths in (e) office. does not affect (e) layout, occupanc, or egress. Complete | Commercial or tenant improvement | Complete | 6 months | |
| May 3, 2022 | 1 Sansome St 41/f: structural permit for structural beam installed to support an operable wall partition. ref t.i permit 202112164592. Complete | Revision or supplement | Complete | Within 1 month | |
| Jan 11, 2022 | 2100 Pacific Av #0 Rev to pa202103237049: to record that shortcrete was used instead of pour in place concrete. update special inspection form to reflect change. Complete | Revision or supplement | Complete | Within 1 month | |
| Nov 18, 2021 | 650 Townsend St Revision to pa# 202011209346. ste 160 & 180. revise scope of demolition. add finishes to existing corridor. modify existing non-building steel structure. Complete | Revision or supplement | Complete | 2 months | |
| Oct 8, 2021 | 185 Berry St Replacement of (e) guardrails and handrails @ 4 locations. the stairs are from existing parking garage to plaza level (of stairs) Issued | Deck, stairs or patio cover | Issued | Within 1 month | |
| Mar 23, 2021 | 2100 Pacific Av #0 9th fl: voluntary seismic upgrade. existing shear walls at the north face of 9th fl to be strengthened additionally, hollow clay tile walls and urm walls in the attic are voluntarily strengthened. Complete | Seismic retrofit or foundation | Complete | 4 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Michael Paul Gemmill? Request a correction.