Peter David Bonneau
Engineer · Pe Structural Design · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeCivil Engineer C-81545First issued May 29, 2013, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 23 permits since 2019, 23 in the last 5 years. Latest filed Oct 19, 2026.
- What kind of projects?
- Home remodel 13 · Addition 6 · Deck, stairs or patio cover 2
- How long do their permits take?
- Home remodel: 4 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 16,268 permits.
Where
- Castro/Upper Market3
- Glen Park3
- Inner Sunset2
- Marina1
Most recent
- 2938 Pierce StRev 202409160848: changes to layout, deck & basement framing.Apr 22, 2025Complete
- 3474 16th St #0Hall bath, laundry room, primary bedroom and office remodel, new primary bathroom, new side windows in lightwell, new ducting.Apr 21, 2023Complete
- 621 Baker StRemodel of upper unit w/ new bathroom at 3rd flr and new 8'wide dormer meeting 311 notification exception.Apr 19, 2023Complete
- 64 Divisadero StConvert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrsNov 3, 2022Complete
- 72 Harper StRec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump.Aug 25, 2022Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Oct 19, 2026 | 940 Bay St Unit #18 code compliance. comply with nov 2025 39221. add new beams, remove non-load bearing wall. Triage | Legalize or fix a violation | Triage | — | |
| Aug 6, 2026 | 34 St Marys Av First floor horizozntal addition (increase of 131sq ft of habitable living space). second floor vertical addition (increase of 681 sq ft of habitable living space). rear patio replacement. interior remodel. Filed | Addition | Filed | — | |
| Jul 15, 2025 | 1269 05th Av Remodel of 2 unit bldg with 450 squre foot additon at 1st and 2nd floor(unit 1269) and 94 square foot additon at 3rd floor(unit 1271) Issued | Addition | Issued | 4 months | |
| Jul 7, 2025 | 158 Flood Av The purpose of this permit is to change the engineer of record. this set has new structural drawings associated with 202501098034. no change in scope. Issued | Revision or supplement | Issued | Within 1 month | |
| Jun 24, 2025 | 2762 21st St Remodel of entire house and a 2nd story addition with front and rear roof decks on 2nd level. Issued | Addition | Issued | 8 months | |
| Apr 22, 2025 | 2938 Pierce St Rev 202409160848: changes to layout, deck & basement framing. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| May 16, 2024 | 146 Elsie St Whole house remodel. backyard remodel w/ new deck 30" above grade. modifications to two bay windows exempt from 311 notification per municipal code section 136. addition at 2nd floor/ rear 2nd floor deck Approved | Addition | Approved | — | |
| Feb 9, 2024 | 64 Divisadero St #0 Reconstruction of legal non-conforming deck in disrepair as permitted by planning code sec 181.6.4 sructural alterations required to reinforce the struture to meet the standards for seismic loads and forces of the building code Filed | Deck, stairs or patio cover | Filed | — | |
| Nov 3, 2023 | 621 Baker St Revision to permit# 202304195985: changes to layout and addition of 2nd dormer meeting 311 notification exception.new front elevction windows will be double hung wood windows with integrated and new door with transom and casement wood window. Complete | Revision or supplement | Complete | Within 1 month | |
| Apr 21, 2023 | 3474 16th St #0 Hall bath, laundry room, primary bedroom and office remodel, new primary bathroom, new side windows in lightwell, new ducting. Complete | Home remodel | Complete | Within 1 month | |
| Apr 19, 2023 | 621 Baker St Remodel of upper unit w/ new bathroom at 3rd flr and new 8'wide dormer meeting 311 notification exception. Complete | Home remodelType unconfirmed | Complete | 1 month | |
| Apr 7, 2023 | 218 Miguel St Revision to pa# 202205275172, partial foundation replacement instead of full. Complete | Revision or supplement | Complete | Within 1 month | |
| Feb 3, 2023 | 218 Miguel St Int. remdl of (e) 2 stry sfr. no additiona unit. siding replacement at rear. no work at front facade. minor vert/horz addition at 2nd floor within (e) footprint, for primary brm. (n)roofdeck Issued | Addition | Issued | 15 months | |
| Nov 3, 2022 | 64 Divisadero St Convert unfinished 1st floor to living space, incl, 2 new bedrooms + hall bath convert (e) bedroom in to new dining room and 2nd flr remodel (e) 2nd floor bathrm. new int stair @ existing light well. no work on 3rd and 4th flrs Complete | Home remodel | Complete | 10 months | |
| Aug 25, 2022 | 72 Harper St Rec to pa 202201115724 new 1st floor bedroom and family room, 2nd floor interior remodel, new hardscape, replace fau with heat pump. Issued | Home remodelType unconfirmed | Issued | 1 month | |
| Aug 8, 2022 | 115 Gennessee St 1st and 2nd floor horizontal addition, interior remodel. new backyard hardscape. Issued | Addition | Issued | 12 months | |
| May 27, 2022 | 218 Miguel St 1st fl - remodeling including new family room, bath and bedroom; replace (e) brick foundation Complete | Home remodelType unconfirmed | Complete | 9 months | |
| May 4, 2022 | 1382 06th Av 2nd fl remodel including remodeled kitchen & relocated half bath, and removal of (e) fire place. 3rd fl interior remodel including remodeled bathroom, new primary bathroom & closet. replace 4 windows (front facing) windows & rear patio door. Complete | Home remodel | Complete | Within 1 month | |
| Feb 25, 2022 | 1980 Scott St Interior remodel: replacement of interior stair, kitchen remodel, master bath remodel, new half bath. replace exterior doors and siding at 1/f in back. no changes to front facade. Complete | Home remodel | Complete | Within 1 month | |
| Jan 28, 2022 | 115 Gennessee St Replace foundation. reloate laundry on 1st fl. remodel (e) 3rd fl bathroom. Issued | Seismic retrofit or foundation | Issued | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Peter David Bonneau? Request a correction.