Raymond Lui
Engineer · Sfdpw · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeStructural Engineer S-4094First issued Feb 7, 1997, expires Sep 30, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the BPELSG enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 34 permits since 2007, 34 in the last 5 years. Latest filed Sep 28, 2026.
- What kind of projects?
- Commercial or tenant improvement 13 · New building 7 · Home remodel 6
- How long do their permits take?
- Commercial or tenant improvement: 12 months. City typical for the same review: 3 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 13 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 6,215 permits.
Where
- South of Market5
- Bayview Hunters Point3
- Mission2
- Chinatown2
Most recent
- 1828 Egbert AvProject will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility.Apr 7, 2025Issued
- 2401 Keith StTenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av.May 2, 2024Issued
- 1419 Bryant StBuild out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to includeMar 5, 2024Issued
- 1490 Mason StPriority process per ab004: chinatown public health ctr, renovation of exterior/interior/broadway tunnel below clinic improvement. some site reno proposed to improve accessibility along mason st entry & pedestrian access for broadway tunnel. incl storage ocupancy (s-2)Dec 23, 2022Issued
- 49 South Van Ness AvConstruct a concrete island in the 49svn basement for housing new parking control equipments. pay station will be seismically braced to the bldg in the elevator lobby in the basement. power and data connnection to parking equipment as necessary.Jun 17, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 28, 2026 | 515 Grant Av Repair sub-sidewalk basement roof slab Issued | Home remodel | Issued | Within 1 month | |
| Apr 8, 2026 | 1828 Egbert Av Ref#: 202412317576. work consisting of contructing new 4 stop freight elevator in existing shaf. 2hr rated shaft walls plus 2 new 2 hr rated shaft walls to creat the 4 sided shaft enclosure. project scope includes cutting into the (e) mat foundation to create the elevator pit, plus new steel Issued | OtherType unconfirmed | Issued | 6 months | |
| Nov 7, 2025 | 2601 40th Av Alteration to (e) roof framing with addition of roof travel restraint anchors. Complete | Home remodel | Complete | Within 1 month | |
| Sep 22, 2025 | 1200 Carroll Av Site permit-2 of 4, fire department training facility, bldg #a1, 2-story, type 2b Issued | New building | Issued | 6 months | |
| Jul 29, 2025 | 2601 40th Av Revision to pa 202403258517 and comprises alteration of existing concrete footing Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 3, 2025 | 800 Grant Av Revision to pa #202402276649 to include removal of existing steel beams and replaced with a 10" thick reinforced concrete slab Filed | Revision or supplement | Filed | — | |
| Apr 7, 2025 | 1828 Egbert Av Project will serve as temporary location for officers for donning & doffing while a(n)police station is constructed.as such,it will not serve as a police station & is thus not considered an essential services facility. Issued | Commercial or tenant improvement | Issued | 12 months | |
| Nov 5, 2024 | 750 Phelps St Proj-24-0605; mou sfpuc. to erect 3 stories, no basement, type v-b, business building. (a-2,b,f,h-3) Approved | New building | Approved | — | |
| May 2, 2024 | 2401 Keith St Tenant improvment of southeast health center 2401 keith st clinic building. interior scope includes modified partitions, finishes, improvements to mechanical, electrical, plumbing, fire protection/alarm systems, glazing replacement and modifications to sidewalk landscape area along armstrong av. Issued | Commercial or tenant improvement | Issued | 13 months | |
| Mar 5, 2024 | 1419 Bryant St Build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to include Issued | Commercial or tenant improvement | Issued | 13 months | |
| Feb 27, 2024 | 800 Grant Av Alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalk Issued | Home remodelType unconfirmed | Issued | 4 months | |
| Feb 27, 2024 | 391 Sutter St #0 Alteration of subsidewalk basement roof slab to accommodate construction of accessible curb ramps at sidewalk Issued | Home remodelType unconfirmed | Issued | 4 months | |
| Jan 29, 2024 | 387 Ellis St Structural alteration of subsidewalk basement roof slab to install new accessible curb ramps Issued | Home remodel | Issued | Within 1 month | |
| Aug 2, 2023 | 415 Jones St Revision to 202303093396: no construction on bldg, work is only at sidewalk. revise basement roof slab design. basement area is used as storage for corner store, basement slab is being rebuilt Filed | Revision or supplement | Filed | — | |
| Mar 9, 2023 | 415 Jones St Reconstructing sub sidewalk basement slab Issued | Seismic retrofit or foundationType unconfirmed | Issued | Within 1 month | |
| Dec 23, 2022 | 1490 Mason St Priority process per ab004: chinatown public health ctr, renovation of exterior/interior/broadway tunnel below clinic improvement. some site reno proposed to improve accessibility along mason st entry & pedestrian access for broadway tunnel. incl storage ocupancy (s-2) Issued | Commercial or tenant improvement | Issued | 15 months | |
| Dec 14, 2022 | 375 Woodside Av Replace an existing boiler to two modular boilers in the mechanical room. Issued | Other | Issued | 12 months | |
| Apr 6, 2022 | 101 Horne Av Revision to pa# 201912300885. revision to stair footing due to site conditions. stair mat slabs are now supported by ciph foundations rather than directly on the soil. Complete | Revision or supplement | Complete | Within 1 month | |
| Aug 18, 2021 | 630 Valencia St Structural: voluntary bracing of 4 exterior beams. architectural: patch back wall and ceiling finishes at structural work. new furring partition at drinking fountain. barrier removal: new accessible drinking fountain, bathroom signs, minor barrier removal at 2 public restrooms. Complete | Home remodelType unconfirmed | Complete | 12 months | |
| Jun 17, 2021 | 49 South Van Ness Av Construct a concrete island in the 49svn basement for housing new parking control equipments. pay station will be seismically braced to the bldg in the elevator lobby in the basement. power and data connnection to parking equipment as necessary. Complete | Commercial or tenant improvementType unconfirmed | Complete | 4 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Raymond Lui? Request a correction.