Yogesh Chitlangia
Architect · Yogesh Chitlangia Architect · San Carlos
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-31132First issued May 21, 2007, expires Aug 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 30 permits since 2008, 30 in the last 5 years. Latest filed Mar 27, 2026.
- What kind of projects?
- Commercial or tenant improvement 7 · Other 7 · ADU 4
- How long do their permits take?
- Commercial or tenant improvement: 6 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Commercial or tenant improvement: 7 permits in San Francisco
Time to get a permit
Median from filing to permit, from 7 issued permits filed since 1966. City is the San Francisco median for the same kind of review, from 3,682 permits.
Where
- Bernal Heights2
- South of Market2
- Mission1
- Western Addition1
Most recent
- 600 York StWork in 1st floor common areas and storage area - drywall & flooring repairs like for like per architectural plans. all interior.Mar 27, 2026Complete
- 1100 Divisadero StConvert portion multipurpose rms within e church structure for child daycare use (max 48 kids).convert multipurpose rm into 2 classrms,convert e office/storage at right corner into new classrm.convert e kitchen area into staff/lunch rm for daycare.create outdr use area for daycare within e sideyard.Feb 15, 2019Complete
- 166 Park StHorizontal add.rear addition/remodel/convert(e) lower floor storage(e)2 story bldg into new res'l dwg incl:remove rear portion of(e)bldg at lower floor&upper floor,(n)rear addition at lower & upper floor; create(n)1 car garage at lower fl,rescope(e)driveway access to the(n)garage create(n)2 bedrms..Apr 13, 2017Complete
- 901 Cole StOccupancy load modification to include existing open mezzanine. no work. no other changes proposed.Nov 2, 2015Issued
- 40 Rausch StConvert existing basement storage of main building at the front of lot into new residential unit. no additional change to existing upper floors, residential units, or residential units at rear buildingJul 11, 2014Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| May 6, 2026 | 67 B Mirabel Av Revision to pa 202407267339 that includes remove the fire rating requirement for rear exterior wall for the proposed adu (adjacent to rear stairs). since non require per the applicable code. no additional change to previously approved permit, which is to remain as approved Issued | Revision or supplement | Issued | Within 1 month | |
| Mar 27, 2026 | 600 York St Work in 1st floor common areas and storage area - drywall & flooring repairs like for like per architectural plans. all interior. Complete | Commercial or tenant improvementType unconfirmed | Complete | Within 1 month | |
| Dec 16, 2025 | 111 San Pablo Av Interior kitchen remodel that includes: remove interior non bearing wall between existing kitchen and sitting room and reconfigure new kitchen layout. replace existing rear door with new to accomodate proposed kitchen counter. no change to existing building footprint, area proposed. Complete | Home remodel | Complete | 1 month | |
| Oct 15, 2025 | 1360 Jones St Railing and guardrail repairs at (e) decks and interior stairs voluntary code upgrades with no structural or layout components to replace non compliant railings/guardrails Complete | Deck, stairs or patio cover | Complete | 1 month | |
| Aug 13, 2025 | 555 Fulton St #101 Addition of 4 safety gates at the exterior of the property for an emergency safety precaution. Filed | Deck, stairs or patio cover | Filed | — | |
| Mar 28, 2025 | 67 B Mirabel Av Conversion of (e)lower floors basement/ storage spaces of an existing 2-unit residence into a new adu(1011 sq.ft.)convert(e) 2 lower levels of storage/ basement areas into one(n)adu. add a new internal stairs connecting the 2 levels of the proposed adu.no cahange to existing 2 units @ 1st & 2nd fl Issued | ADU | Issued | 10 months | |
| Dec 4, 2024 | 201 Spear St 6/fl- replace (2) doors at 2 different locations within the same opening. Issued | OtherType unconfirmed | Issued | 3 months | |
| Aug 21, 2023 | 67 Mirabel Av Revision to pa# 202208160608, replace portions of (e) masonary brick footin/ foundation at lowest level w/ new concrete foundation footing, no change to rest of previously approved scope. Expired | Revision or supplement | Expired | 1 month | |
| Aug 16, 2022 | 67 A Mirabel Av Interior remodel @ (e) 2 dwelling units located @ 1st & 2nd flr that includes: 2nd flr: add (n) bath & (n) bedroom to create a 2bed/2 bath unit. remodel (e) kitchen. 1st flr: reconfigure interior layout to create a 2bed/2bath unit.no changes to (e) 2 levls of basement space.(e) bldg is not sprinkler Complete | Home remodel | Complete | 10 months | |
| Feb 16, 2022 | 1206 34th Av Replace roof awning over (e) entry landing at 2nd fl with (n) flat roof to match existing house roof. no change proposed to rest of the house or floor plan layout. Complete | Deck, stairs or patio cover | Complete | 1 month | |
| Dec 28, 2021 | 1782 21st Av Revision to pa# 2017-0131-8285: walls between separate and living area modified, structural plan updated, (n) built in fire place, (n) 20 min fire rated doors, (n) closet, (n) reclocated furance Complete | Revision or supplement | Complete | Within 1 month | |
| Jun 15, 2021 | 288 Union St #0 Project consists of converting (e) 1st floor area of (e) 4 story multifamily building (3 dwelling units) into an adu (of 607 sq ft, 1 bedroom, 1 bath). work limited to non-structural fixtures only. no changes to existing structural foundation/framing, building footprint or exterior proposed. Complete | ADU | Complete | 19 months | |
| Nov 2, 2020 | 1350 Shotwell St Project composes of addition remodel lower floor unit and includes 2 bed and 2 bath. 885 sq ft. lower floor level to create min 8' clear finish ceiling approx 44 cu yd excavation extg 2 units located on the main level upper level are to remain as is Complete | Addition | Complete | 6 months | |
| Nov 20, 2019 | 1539 Folsom St Replace all existing single pane glass windows at front and left side w/ new double pane glass windows (similar configuration, size,& material). accessibility upgrade at existing front entry door to 1st floor. to remove non-complying change in elevation/grade Issued | Other | Issued | 2 months | |
| Feb 15, 2019 | 1100 Divisadero St Convert portion multipurpose rms within e church structure for child daycare use (max 48 kids).convert multipurpose rm into 2 classrms,convert e office/storage at right corner into new classrm.convert e kitchen area into staff/lunch rm for daycare.create outdr use area for daycare within e sideyard. Complete | Commercial or tenant improvement | Complete | 6 months | |
| Jan 23, 2019 | 155 Harriet St #1 Relocate e exterior recessed door, build infill wall to straighten e curved recessed entry. relocate e intercom key access on side. no structural modifications to e building . no change to layout maher not req Complete | OtherType unconfirmed | Complete | 5 months | |
| Apr 16, 2018 | 550 Larkin St Three (n) adu @ (e) basement storage area on lower fl. that include one 1-bed unit & 2-studio units, (n) laundry rm, (n) access stairs from main 1st fl per ord# 162-16. Filed | ADU | Filed | — | |
| Aug 7, 2017 | 895 37th Av (n)adu per ord #162-16. convert portion of(e)ground fl garage/storage area into(n)accessory dwelling unit; replace(e)rear yard access door w/ (n)6' wide sliding door; relocate(e)water hters/furnace upper fl; relocate laundry sink &(n)stacked washer/dryer; no change to(e)unit, bldg footprint or extr Complete | ADU | Complete | 13 months | |
| Apr 13, 2017 | 166 Park St Horizontal add.rear addition/remodel/convert(e) lower floor storage(e)2 story bldg into new res'l dwg incl:remove rear portion of(e)bldg at lower floor&upper floor,(n)rear addition at lower & upper floor; create(n)1 car garage at lower fl,rescope(e)driveway access to the(n)garage create(n)2 bedrms.. Complete | Commercial or tenant improvementType unconfirmed | Complete | 15 months | |
| Jan 31, 2017 | 1782 21st Av Interior remodel & rear addition to (e) 2 story include new lower floor addition / remodel to convert rear half of (e) garage/storage into habitable room with new kids play room, new office, new family room, new bath, new utility (approx 990 sf). upper floor: remodel (e) interior stair to lower floo Complete | Addition | Complete | 9 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Yogesh Chitlangia? Request a correction.