Howard E Blecher
Architect · Blecher Bldg & Urban Design · San Francisco
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-36464First issued May 11, 2017, expires Jan 31, 2027.
Source: DCA license roster, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 38 permits since 2014, 38 in the last 5 years. Latest filed Aug 28, 2026.
- What kind of projects?
- Home remodel 13 · ADU 8 · Commercial or tenant improvement 6
- How long do their permits take?
- Home remodel: 2 months. City typical for the same review: within 1 month.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
Home remodel: 13 permits in San Francisco
Time to get a permit
Median from filing to permit, from 10 issued permits filed since 1966; 1 still in review. City is the San Francisco median for the same kind of review, from 9,196 permits.
Where
- Outer Richmond3
- Mission3
- Excelsior2
- Pacific Heights2
Most recent
- 1012 Grant AvUnit #31 top floor: interior remodel (e) studio apartment. includes new kitchen in-kind, remodel of (e) bathroom, new interior wall/partition, incorporation of (e) common-area laundry space into apt 31. new roof-mounted mini-split heat-pump system, reroute (e) dryer vent from common area laundry...Aug 18, 2026Issued
- 111 Congdon StInterior remodel w/ replacement & new plumbing fixtures + electrical work. new deck and awning on rear facade. new deck for hot tub less than 30" above grade. new and removed windows on sides + rear.Nov 28, 2022Issued
- 690 Spruce St #102Unit 102 - bathroom remodel with new shower on 2/f.Nov 2, 2022Complete
- 386 27th AvProposed interior remodel w/ plumbing & electrical work. replacement of windows on side & rear, (1)(n) bathroom. remodel 2 bathrooms in kind, add 1 laundry room.Dec 30, 2021Complete
- 3434 18th StInterior remodels of units 1, 2, 3, 4, 5, 6, 7 & 8 and common areas. includes mechanical, electrical and plumbing work. no structural work. executive directive 13-01 (100% affordable priority process) privately funded.Aug 4, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Aug 28, 2026 | 64 Woodland Av #0 legalize existing ground-floor finished space as a state adu under san francisco planning code section 207.2. work required for adu code compliance is limited to items shown in the drawings and related compliance documents, including field verification and documentation of existing floor/ ceiling Filed | ADU | Filed | — | |
| Aug 18, 2026 | 1012 Grant Av Unit #31 top floor: interior remodel (e) studio apartment. includes new kitchen in-kind, remodel of (e) bathroom, new interior wall/partition, incorporation of (e) common-area laundry space into apt 31. new roof-mounted mini-split heat-pump system, reroute (e) dryer vent from common area laundry... Issued | Home remodel | Issued | 1 month | |
| Apr 27, 2026 | 259 A 07th Av Addressing permit only: add a new address 259 a 7th ave. link to apn 1426/013. ref pa #2024-0124-4517 Issued | Revision or supplementType unconfirmed | Issued | Within 1 month | |
| Dec 29, 2025 | 2787 Bryant St Add 1 state adu per ord 162-16, 95-17,162-1. new exit passageway.remove bath at attic.remove stairs 3/f attic.replace attic ladder.improve ext stairs at rear.handrail at front stairs.protective bollards at garage. new trash enclosure. Cancelled | ADU | Cancelled | — | |
| Dec 29, 2025 | 36 Aladdin Tr Basement of 36 aladdin terr: proposed media room to satisfy nov 201890782. replace 4 burner cooktop with 2 burner cooktop. restricted use- no bedroom or sleeping area in basement. this space to be used only in conjuction with dwelling unit at 2nd story. no udu determined by planning dept. Issued | Legalize or fix a violation | Issued | 5 months | |
| Jan 13, 2025 | 939 Castro St Revision to pa#: 202311211263, 202409181060, 202411074607. revised layout of garage, 1st level hall 1, hall 2 + office, (e) to remain stair supports. structural revised ceiling framing at 1st level entry ceiling. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 17, 2024 | 259 07th Av Voluntry structural strenthening. new walls windows & doors at garage remove e) brick chimney. ref pa 202401244517 Complete | Revision or supplementType unconfirmed | Complete | Within 1 month | |
| Jan 24, 2024 | 259 07th Av To establish state adu on ground floor and interior alterations/facade modifications, with electrical, plumbing and structural work. (2 residential units + adu) Complete | ADU | Complete | 7 months | |
| Nov 21, 2023 | 6 San Pablo Av Altered site permit. revision to bpa#2022-0805-0034 related to variance case 2022-007994var. proposed stairs, landing and roof deck at rear, plus additional interior alterations and additional exterior facade changes. Issued | Revision or supplement | Issued | 9 months | |
| Nov 21, 2023 | 939 Castro St Proposed remodel with electrical, plumbing, and structural work. new 1st floor living space and new roof deck. automatic fire sprinkler only entire ground floor according with nfpa13d under deferred submittal Complete | Addition | Complete | 9 months | |
| Jun 7, 2023 | 1851 Noriega St Restore walls after water damage. double layer of 5/8" drywall in women's bathroom. double layer at 5/8" drywall in wall adjacent to kitchen. double layer at 5/8" drywall in wall adjacent to storage. all interior. Complete | Commercial or tenant improvement | Complete | 1 month | |
| Apr 19, 2023 | 2685 California St Proposed adu unit under state program w/ structural, plumbing & electrical work to comply w/ nov# 201711673. Complete | ADU | Complete | 13 months | |
| Dec 30, 2022 | 2782 24th St Comply with accessible business entrace program abe 202211295367 Cancelled | Commercial or tenant improvement | Cancelled | — | |
| Dec 30, 2022 | 2619 25th Av Proposed accessory dwelling unit (adu) addition of dwelling unit. new exit passageway for adu. replacement of garage door to comply with nov #201976204. remove interior stairs and new bath at 2nd fl. new rear decks and stairs at 1st & 2nd floors. Approved | ADU | Approved | — | |
| Nov 28, 2022 | 111 Congdon St Interior remodel w/ replacement & new plumbing fixtures + electrical work. new deck and awning on rear facade. new deck for hot tub less than 30" above grade. new and removed windows on sides + rear. Issued | Home remodel | Issued | 7 months | |
| Nov 2, 2022 | 690 Spruce St #102 Unit 102 - bathroom remodel with new shower on 2/f. Complete | Home remodel | Complete | 20 months | |
| Oct 25, 2022 | 36 Aladdin Tr To comply with nov# 201890782. addition of adu (accessory to 36 aladdin ter) per ordinance no 162-16, 95-17 & 162-17. improvements to basement level passageway to public way. convert basement storage (34 aladdin ter) to media room. Withdrawn | Legalize or fix a violation | Withdrawn | — | |
| Aug 22, 2022 | 257 Romain St Replacement skylight with lighting. new attic access panel. Complete | Other | Complete | 3 months | |
| Aug 5, 2022 | 6 San Pablo Av Proposed remodel & horizontal addition with structural,plumbing & electrical work. replacement & new windows on front,sides and rear. Issued | Addition | Issued | 11 months | |
| Dec 30, 2021 | 386 27th Av Proposed interior remodel w/ plumbing & electrical work. replacement of windows on side & rear, (1)(n) bathroom. remodel 2 bathrooms in kind, add 1 laundry room. Complete | Home remodel | Complete | Within 1 month |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.