Mahya Salehi Fadardi
Architect · Mahya Salehi Fadardi
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-38610First issued Jun 8, 2020, expires Aug 31, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 20 permits since 2020, 20 in the last 5 years. Latest filed Jul 18, 2025.
- What kind of projects?
- ADU 6 · Home remodel 4 · Addition 3
- How long do their permits take?
- ADU: 9 months. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
ADU: 6 permits in San Francisco
Time to get a permit
Median from filing to permit, from 4 issued permits filed since 1966; 2 still in review. City is the San Francisco median for the same kind of review, from 2,088 permits.
Where
- Russian Hill2
- Mission2
- Castro/Upper Market1
- Marina1
Most recent
- 42 Allen StA mandatory seismic upgrade unconditioned garage of ab-106 and ab-107. conversion of(e)unconditioned garage & storage spaces into 2 adu & utility room in the(e)3 level multi-family building as indicated on drawings.demolition of the(e)storage rooms in the rear yard.Jul 18, 2025Filed
- 1449 Hyde St #0Conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new.Feb 27, 2025Issued
- 849 A Dolores StConversion of addition to existing 527 sf family room & bath to become a 550 sf adu unit per oridinance 95-17.Jun 7, 2023Complete
- 4160 20th StTo comply with nov# 202293305. partial conversion of existing basement level into 530 sf adu unit.Jul 20, 2022Issued
- 418 Capp St #0Ground level interior conversion of existing garage into a 2bd/2ba unit.Dec 2, 2021Complete
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Jul 18, 2025 | 42 Allen St A mandatory seismic upgrade unconditioned garage of ab-106 and ab-107. conversion of(e)unconditioned garage & storage spaces into 2 adu & utility room in the(e)3 level multi-family building as indicated on drawings.demolition of the(e)storage rooms in the rear yard. Filed | ADU | Filed | — | |
| Jun 24, 2025 | 2038 A Mcallister St Construction of new one (1) detached 1-story, type v-b, adu with 2 bedrooms & 2 bathrooms. pv & f/a under sep permit(s). exist main building is 3-story, 5 units residential r-2 occupancy. adding accessory (1) unit. Approved | New building | Approved | — | |
| Jun 5, 2025 | 853 Rhode Island St Limited to: (n) 4" concrete slab on grade; (n) wood 2nd level with (n) stair to rear yard; (n) 2 panel sliding door and fixed window on rear facade of 2nd level Filed | Deck, stairs or patio coverType unconfirmed | Filed | — | |
| Feb 27, 2025 | 1449 Hyde St #0 Conversion of (e) unconditioned storage space into (n) 775sf adu with 1 bed & 1 bath,storage room, trash toter enclosure & 1hr hallway connecting the adu to building foyer. (n)wood framed steps on (e) sloped concrete floor.replace rear yard deck with new. Issued | ADU | Issued | 11 months | |
| Dec 25, 2024 | 46 Cresta Vista Dr Revision to pa#202311080463 specifically concerns deck area & basement level. revised details for new deck columns; adding underpinning details. revising length of opening at basement level & adjustment to shear wall @ each sides of door opening.revised title 24.providing drainage & grading drawings Issued | Revision or supplement | Issued | 7 months | |
| Apr 7, 2024 | 1466 15th Av Partial conversion of(e)unconditioned 1st fl to(n)conditioned area.(n)conditioned areas include 1b,1ba,a music & family room and wetbar.103 sf addition to (e)garage & 106 sf rear addition to conditioned space.demolition of(e) stairs in the lgihtway.interior remodel of upper level. Issued | Addition | Issued | 7 months | |
| Jun 7, 2023 | 849 A Dolores St Conversion of addition to existing 527 sf family room & bath to become a 550 sf adu unit per oridinance 95-17. Complete | ADU | Complete | 6 months | |
| Sep 21, 2022 | 2901 Pine St Limited to interior remodel. infill of 250 sf(n)fl to (e)opening to below on 2nd level to expand occupiable area.open to below is enlcosed from above.addition of one(n)bedroom on en-suite bedroom & bath on the 2nd level.total proposed:3 beds/3.5 baths.remodel (e) kitchen as shown on the plans. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Sep 20, 2022 | 2975 Cesar Chavez St Add insulation and drywall to (e) framing at attic level. not for occupied usage. Complete | Home remodelType unconfirmed | Complete | Within 1 month | |
| Jul 20, 2022 | 4160 20th St To comply with nov# 202293305. partial conversion of existing basement level into 530 sf adu unit. Issued | ADU | Issued | 11 months | |
| Apr 4, 2022 | 531 Hill St To comply with nov 201700141, 202287240, and 202287250. to leaglize work including half bath and living room per plans and to address any other items in complaint. no structural work done. Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jan 12, 2022 | 919 Ingerson Av Interior remodel of the (e) sfh & addition of (n) second floor over the rear half of the (e) structure. (n) second floor to include one (n) bedroom & one (n) bathroom. to comply w/ nov# 20096567 by legalizing (e) storage room on ground floor. Filed | Legalize or fix a violation | Filed | — | |
| Dec 2, 2021 | 418 Capp St #0 Ground level interior conversion of existing garage into a 2bd/2ba unit. Complete | ADU | Complete | 8 months | |
| Dec 2, 2021 | 2709 Baker St Demolish (e) secondary staircase from 2nd fl to 3rd fl as indicated on plans. extend floor. demolish staircase (18 sqft) + enclose open deck area to create a (n) 90 sqft laundry. demo (e) interior walls around kitchen on 3rd fl to create an open kitchen. extend indicated on plans. Issued | AdditionType unconfirmed | Issued | 6 months | |
| Nov 24, 2021 | 418 A Capp St New 876 sf detached adu in the rear yard of a multi-family residence. Issued | New building | Issued | 9 months | |
| Nov 23, 2021 | 2034 A Greenwich St Conversion of 325 sf first level storage into new studio accessory dwelling unit (adu) per govt code section 65852.2. Filed | ADU | Filed | — | |
| Nov 8, 2021 | 610 Illinois St #303 Unit #303: interoir kitchen renovation, bath renovation level 1, bath renovation level 2.exterior ventless carrier, mini split heat pump dual zone. Expired | Home remodel | Expired | 1 month | |
| Oct 21, 2021 | 2034 Greenwich St (e) living room walls to be demolished on 2/f & 3/f. new beams & posts. installed to create openings btween living room & dining. Complete | Home remodel | Complete | Within 1 month | |
| May 5, 2021 | 898 Carolina St Build rear stairs per approved variance ref: 2020-003848var Complete | Deck, stairs or patio cover | Complete | 8 months | |
| Apr 8, 2021 | 2975 Cesar Chavez St Revision to pa# 202009093811; room expansion on ground level & level 2, additional sqft 395 added conditioned space on ground level and level 2 Complete | Revision or supplement | Complete | 17 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Mahya Salehi Fadardi? Request a correction.