Mark Kevin Hogan
Architect · Openscope Studio
Public records
From the licensing board and the city of San Francisco.
The short answer
- Licensed?
- License activeArchitect C-33268First issued Sep 12, 2011, expires Apr 30, 2027.
Source: DCA License Search, retrieved Nov 5, 2026
- Any board discipline?
- None found.
We searched the California Architects Board enforcement list on Nov 5, 2026.
- Worked in San Francisco?
- 140 permits since 2015, 140 in the last 5 years. Latest filed Sep 30, 2026.
- What kind of projects?
- ADU 64 · Home remodel 33 · Commercial or tenant improvement 13
- How long do their permits take?
- ADU: 13 months. City typical for the same review: 9 months.
Permits filed each year
San Francisco permits by the year they were filed. The last 5 years are in blue.
What are you planning?
Pick your kind of project to see their permits for it.
ADU: 64 permits in San Francisco
Time to get a permit
Median from filing to permit, from 46 issued permits filed since 1966; 9 still in review. City is the San Francisco median for the same kind of review, from 6,392 permits.
Where
- Tenderloin13
- Hayes Valley7
- Pacific Heights6
- Nob Hill5
Most recent
- 1485 Clay StAdd four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit.Feb 19, 2026Filed
- 320 14th StLegalization of 2 units: 320 & 324, through the adu program (sfpc 207.1).Jan 29, 2026Issued
- 154 Tiffany AvRev 201910023377- maintain original occupancy of r-3 per fs 12 and update the code standard to 2022 codes. deferred sprinkler design per ab-20 under separate permit. ground floor sprinklered to nfpa 13d voluntarily.Aug 14, 2024Complete
- 4042 Fulton St #0The scope of work is the add 1 adu to the storage area at the ground floor per sfpc 207(c)(4).Dec 7, 2023Complete
- 1964 Post St #0Add two (2) new adu to the ground floor of the building under ordinance 162-16.May 1, 2023Issued
| Filed | Project | Type | Status | Time to permit | Open |
|---|---|---|---|---|---|
| Sep 30, 2026 | 2033 B Leavenworth St Unit b: 9.6sf addition to unit b, under (e) roof. Filed | Addition | Filed | — | |
| Sep 18, 2026 | 1801 California St #0 Revision to 201811206437, creating minor layout revisions to units 34 and 35. no work proposed at exterior. Issued | Revision or supplement | Issued | Within 1 month | |
| Sep 14, 2026 | 1708 Cabrillo St Interior remodel 3fl to kitchen to be relocated one bathroom to be remodeled and one bahtrooom to be added . new electrical heat pump hvac to be installed. 3x (n) skylights to be added , 1 (e) skyulight to be replaced and downsized. no changes to front facade. 2 window replacement in lightwell. Issued | Home remodel | Issued | Within 1 month | |
| Aug 25, 2026 | 1813 15th St To address complaint #2025006321 enf: unit count restored to 6 units. 2 kitchens reinstalled per permit bpa #201808066527 to their original configuration. additional reconfigure kitchens in 1813 and 1815b and 1817b. englarge bathrooms to add a shower in units 1815b and 1817b Complete | Legalize or fix a violation | Complete | Within 1 month | |
| Jul 17, 2026 | 1801 California St Rev to pa# 2018-1120-6437: reconfigure electrical room, adding a door at the sidewalk, and providing a built up floor in the electrical room to aliegn withthe side walk. Issued | Revision or supplement | Issued | 3 months | |
| Jul 15, 2026 | 1779 46th Av 2 story horizontal addition to the rear of the house, partial interior remodel, including a kitchen remodel and powder room, and removal of stair at front facade to relocate the front door at the ground Filed | Addition | Filed | — | |
| Jul 14, 2026 | 2100 Jackson St Revision to pa# 202502069777. changes to structural floor framing & shear wall design noted as rev 3 on sheets s100, s101 & s301. no architectural changes. pre app notes from original permit included in this set for reference. Filed | Revision or supplement | Filed | — | |
| Jun 26, 2026 | 1801 California St Unit 31: a revision to permit 201808096953 - a remodel of the (e) ground floor unit 31. expanding the unit into the (e) adjacent storage areas. no change to front facade. Filed | Revision or supplement | Filed | — | |
| Jun 25, 2026 | 3763 Cesar Chavez St Front bldg - remodeling unit 3763 including reconfiguring the kitchen; converting the sunroom into a bedroom, replace existing transom & doors to the rear deck; remodeling the (e) bathroom and adding another @ 2nd floor. Issued | Home remodel | Issued | Within 1 month | |
| Jun 5, 2026 | 906 Broadway Conditional use authorization per 2024-002799prj, converting a vacant church from an institutional use to event space. cou to general entertainment. scope includes removal of (e) non conforming rr at rear yard, add of n rrs in basement remoce e stair from rear yard to basement, add n int stair Issued | Commercial or tenant improvement | Issued | 3 months | |
| Jun 3, 2026 | 259 Maynard St Add an interior stair connecting the (e) level 1 with the (e) basement. convert the storage area in the basement into habitable space. replace the (e) furnace & water heater & remove the (e) exteior wd stair at the rear yard. Filed | Home remodel | Filed | — | |
| May 28, 2026 | 943 South Van Ness Av #0 Replacing 4 bedroom windows to meet sill ht & eero requipments. window sizes and materials to match similar existing windows on 3rd floor. Issued | Other | Issued | Within 1 month | |
| Feb 19, 2026 | 1485 Clay St Add four adu's to the ground floor. repair of the (e) brick facade in conjunction with the seismic retrofit, under separate permit. Filed | ADU | Filed | — | |
| Jan 29, 2026 | 320 14th St Legalization of 2 units: 320 & 324, through the adu program (sfpc 207.1). Issued | ADUType unconfirmed | Issued | 5 months | |
| Jan 13, 2026 | 2100 Jackson St #0 Renovation of common areas including the addition of a restroom and a lift and construction of a pedestrian connection to existing detached garage. creation of new pedestrian exit from the garage. renoof interiors of units 1b and 1c, including replacement windows. Issued | Home remodelType unconfirmed | Issued | 7 months | |
| Dec 17, 2025 | 2100 Jackson St #0 Unit 9; renovation of including one kitchen, one bathroom, one powder room. addition of three non-street facing windows and improvments to existing roof deck. replacment of existing windows and patio door. Issued | Home remodel | Issued | 8 months | |
| Dec 12, 2025 | 2100 Jackson St Unit #7: non-structural, interior remodel of unit #7 including remodel of 1 kitchen and 4 bathrooms. Issued | Home remodel | Issued | 9 months | |
| Dec 12, 2025 | 2100 Jackson St Unit #6: interior remodel of unit #6. remodel of 1 kitchen and 4 bathrooms. Issued | Home remodel | Issued | 9 months | |
| Dec 12, 2025 | 2100 Jackson St Unit #5: interior remodel of unit #5. remodel of 1 kitchen and 3 bathrooms. Issued | Home remodel | Issued | 8 months | |
| Dec 12, 2025 | 1995 Union St Revision to pa 202411205363 removing the staff room & installing dedicated men & women dressing rooms with 2 showers in each room no changes proposed to exterior Issued | Revision or supplement | Issued | 3 months |
Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.
Are you Mark Kevin Hogan? Request a correction.