CheckMyDesigner

Paul Anthony Littler

Engineer · Holmes Structural · San Francisco

Public records

From the licensing board and the city of San Francisco.

The short answer

Licensed?
License activeStructural Engineer S-6189First issued Dec 17, 2014, expires Jun 30, 2027.

Source: DCA license roster, retrieved Nov 5, 2026

Verify on DCA License Search

Any board discipline?
None found.

We searched the BPELSG enforcement list on Nov 5, 2026.

Worked in San Francisco?
21 permits since 2019, 21 in the last 5 years. Latest filed Oct 9, 2026.
What kind of projects?
Commercial or tenant improvement 13 · Home remodel 5 · Other 2
How long do their permits take?
Commercial or tenant improvement: 1 month. City typical for the same review: within 1 month.

Permits filed each year

San Francisco permits by the year they were filed. The last 5 years are in blue.

What are you planning?

Pick your kind of project to see their permits for it.

Permits
26 permits that name Paul Anthony Littler, newest first, including 5 revisions or supplements that are not counted. Select a permit to see the full record.
FiledProjectOpen
Oct 27, 2026149 New Montgomery St

Engineering and stair details deferred submittal for stair#: 2. ref pa#: 202512111568 and 202605111058.

Filed
Oct 9, 2026300 Howard St

14th and 15th floor: t.i. for interconnecting stars. new floor opening and construction. ref # 14th floor: 202609238502 and 15th floor: 202609017538

Filed
Sep 17, 2026300 Howard St

3rd & 4th floors: t.i. including new interior walls, ceilings, millwork and finishes.

Issued
Sep 1, 2026300 Howard St

5ht & 6th fl - ti including new interior walls, ceilings, millwork & finishes

Issued
Jul 7, 2026300 Howard St

9/f: structural upgrades to accommodate future tenant buildout.

Issued
Jul 6, 2026300 Howard St

16th fl: structural upgrades to accommodate future tenant buildout

Issued
Jul 1, 20261241 Delaware St

Mayor dir ed13-01: unit 3-prequel park- potrero power station dev- temp park use & back of house maintenance space(not occupiable to public), under footprint of unit 3 structure. (n)pathways, railings, paving & lighting (deferred). misc, structural work for back on house raised platform on mat slab.

Filed
Jun 23, 2026300 Howard St

2 : structural upgrades to accommodate future tenant buildout

Issued
May 11, 2026149 New Montgomery St

Roof floor-revision 202512111568- replace roof membrane throughout roof drainage, cricketing and waterproofing to perform new work. roof framingstructural upgrade at area of work. upgrade and extend elevator at roof

Issued
Jan 15, 20261241 Delaware St

Mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine.

Approved
Dec 19, 20251283 Delaware St

Priority project(block 9)potrero power station development agreement.scope includes partial demolition of interior concrete floor and partial demolition of concrete header above existing door. structural retrofit including new foundation piles, a new mat slab and a new interior reinforcement wall.

Issued
Oct 14, 2025500 Terry A Francois Bl

Ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep

Issued
Sep 24, 20252859 22nd St

Revision to permit 202009254954. replace (e) masonry front wall in-kind with new brick-clad framed wall. revised title 24 report. reduce height of (e) south wall to 10 ft

Issued
Jul 2, 2025500 Terry A Francois Bl

3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.

Issued
May 28, 2025550 Terry A Francois Bl

**ab004: deferred slab strengthening frp for pa# 202412247379.

Issued
Jan 28, 2025550 Terry A Francois Bl

Structural slab openings and perimeter shaft walls: (2) shaft wall locations at level 1; (2) slab opening and shaft wall location at level 2; (1) slab opening and shaft wall locations at level 3 thru 6

Complete
Sep 26, 2024460 Townsend St

1f - installation of an rf chamber. includes structural support & anchorage

Complete
Jan 2, 2024420 23rd St

Revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room

Complete
Aug 30, 2023420 23rd St

Select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.

Complete
May 5, 2023420 23rd St

Unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017

Complete

Sources: DataSF i98e-djp9, 3pee-9qhc, retrieved Nov 5, 2026. Names on permits are matched to licenses by license number and name; unmatched records are not shown.

Are you Paul Anthony Littler? Request a correction.